Laserfiche WebLink
<br />\\metro-inet\linolakes\Shared\Community Development\Projects\Capital Improvement Projects\2024 Street Rehabilitation Project\Staff Reports\20240212 CC <br />Award Project\5. 023839-000 Construction Services Proposal.docx <br />17 <br />8 <br /> <br />E <br /> <br />9 <br />T <br />H <br /> <br />S <br />T <br />R <br />E <br />E <br />T <br /> <br /> <br />| <br /> <br />SU <br />I <br />T <br />E <br /> <br />2 <br />0 <br />0 <br /> <br />| <br /> <br /> <br />SA <br />I <br />N <br />T <br /> <br />P <br />A <br />U <br />L <br />, <br /> <br />M <br />N <br /> <br /> <br />| <br /> <br />55 <br />1 <br />0 <br />1 <br /> <br /> <br />| <br /> <br />65 <br />1 <br />. <br />2 <br />8 <br />6 <br />. <br />8 <br />4 <br />5 <br />0 <br /> <br /> <br />| <br /> <br />WS <br />B <br />E <br />N <br />G <br />. <br />C <br />O <br />M <br /> <br />February 7, 2024 <br /> <br />Mr. Michael Grochala <br />Community Development Director <br />City of Lino Lakes <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br /> <br />Re: Proposal for Construction Services for 2024 Street Rehabilitation and Trunk Watermain <br />Project <br />WSB Project No. R-023839-000 <br /> <br />Dear Mr. Grochala: <br /> <br />WSB & Associates, Inc. is pleased to provided a proposal for construction services associated <br />with the 2024 Street Rehabilitation and Trunk Watermain Project. This construction services <br />proposal would be subsequent to the City Council awarding the construction contract. <br /> <br />The project includes a mill and overlay of the following streets: Black Duck Circle (from Black <br />Duck Drive to cul-de-sac), Black Duck Drive (from Black Duck Circle to Birch Street), Black Duck <br />Court (from Black Duck Drive to cul-de-sac), Beaver Circle (from Deerwood Lane to cul-de-sac), <br />Deerwood Circle (from Deerwood Lane to cul-de-sac), Deerwood Lane (cul-de-sac), Linda Lane <br />(from Hodgson Road to 62nd St Trail Crossing), Linda Court (from Linda Lane to cul-de-sac), <br />Linda Circle (from Linda Lane to cul-de-sac), Linda Ave (from Linda Lane to Ware Road), and the <br />alternate on Aspen Lane (from Killdeer Drive to cul-de-sac). <br /> <br />In addition to the roadway rehabilitation, the City will be installing trunk water main improvements <br />along Black Duck Drive. This will include directionally drilling a 12” diameter water main along the <br />northern portion of Black Duck Drive. It will also include directional drilling 16” raw water main <br />along the southern portion of Black Duck Drive. Throughout the entire street project, gate valves <br />will be replaced if they have not been previously repaired. <br /> <br />Scope of Engineering Services <br /> <br />WSB is pleased to provide professional construction engineering services for the 2024 Street <br />Rehabilitation and Trunk Watermain Project including contract administration, construction <br />observation, construction staking, and public notice and weekly updates for project stakeholders. <br />Below is a detailed description of the engineering services and WSB’s proposed approach. <br /> <br />I. Construction Services <br />a. Project Management/Contract Administration <br />Contract Administration includes holding meetings with the contractor & City of Lino <br />Lakes (preconstruction & weekly construction), processing monthly quantities for pay <br />vouchers, and communicating with residents on a regular basis. <br />b. Construction Observation <br />WSB will provide an experienced engineering specialist whose responsibilities will <br />include communicating with the Contactor as an agent of the City, calculating and <br />keeping track of daily construction quantities and costs, contact and meet with <br />residents as necessary, and work with the Contractor to assist with a quality <br />constructed product. <br /> <br />c. Construction Staking (Survey) <br />135