My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02-12-2018 Council Meeting Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2018
>
02-12-2018 Council Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2024 2:25:51 PM
Creation date
3/2/2024 12:01:58 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> Engineering Planning Environmental Construction 701 Xenia Avenue South <br /> Suite 300 <br /> Minneapolis, MN 55416 <br /> Tel: 763-541-4800 <br /> Fax: 763-541-1700 <br /> <br /> <br />Minneapolis St. Cloud <br /> Equal Opportunity Employer <br /> <br /> <br /> <br /> <br />February 8, 2018 <br /> <br /> <br />City of Lino Lakes <br />Mr. Michael Grochala <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br /> <br />Re: Engineering Proposal for the 2018 Mill and Overlay Project <br /> <br /> <br />Dear Mr. Grochala: <br /> <br />The City of Lino Lakes has a Pavement Management Plan which recommends preservation of <br />local roadways based on their OCI ratings. The proposed 2018 Mill and Overlay Project <br />(roadway preservation) includes: <br />Mill and Overlay <br /> <br />· Ware Road (6365 LF) Total Estimated Cost - $415,000 <br />- Project scope to include minor curb and gutter replacement and <br />storm sewer repair <br /> <br />· Brandywood Estates (4610 LF) Total Estimated Cost - $300,000 <br />- Whitetail Trail, White Oak Road, Buckthorn Lane, <br />Chokecherry Road, Velvetleaf lane <br />- Project scope to include minor curb and gutter replacement and <br />storm sewer repair <br /> <br />Based on the City’s existing street maintenance plan and discussions with staff, WSB would <br />perform the following tasks: <br /> <br />I. Prepare Final Project Plans/Maps <br />Final construction plans will be prepared for the milling and overlaying of the <br />above listed roadways. Topographic information will be collected by a <br />combination of field survey, city parcel map information and Lidar contours. <br />Construction plans necessary for the contractor to build the roadway to <br />specifications will be prepared. <br /> <br />RCWD, Ramsey County and Anoka County permits will be obtained for the <br />project.
The URL can be used to link to this page
Your browser does not support the video tag.