Laserfiche WebLink
8 <br />An ADA accessible route shall be provided to all units. The route cannot be behind <br />parking stalls. Vehicles parking in the stalls in front of the unit doors cannot block <br />accessibility. <br /> <br />Grading Plan and Stormwater Management <br /> <br />Per the City Engineer Memo dated March 6, 2024: <br /> <br />The stormwater management for the Lino Lakes Tech Center consists of the installation <br />of storm sewer structures and pipes to convey the site’s runoff to a new BMP (basin) on <br />the west side of the parcel. The runoff is generated from the one 36,040 square foot <br />storage building and associated driveway and parking that is proposed to be constructed <br />on the site. The development of the site will result in 0.156 acres of reconstructed <br />impervious, and 1.329 acres of new impervious for a total of 1.485 acres of total <br />impervious. <br /> <br />Pre- and Post- Development Discharge Rates (cfs) <br />Condition 2-Year 10-Year 100-Year 10-Day Snowmelt <br />Existing 0.02 0.53 5.88 Not provided <br />Proposed 0.00 0.59 5.17 Not provided <br /> <br />Public Utilities <br /> <br />The site municipally served by a 12” watermain located along Park Court. An 8” sanitary <br />sewer main will be installed along CSAH 23 (Lake Drive) and service the building. <br /> <br />Tree Preservation and Mitigation Standards <br /> <br />The Environmental Coordinator and Environment Board reviewed the tree preservation <br />and landscaping requirements. The following comments are from the February 28, 2024 <br />Environmental Board staff report. Additional comments are provided in the attached <br />March 5, 2024 memo. <br /> <br />A tree survey was performed that identified: <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Total Trees Removed 37 <br />Trees Preserved 60 <br />Trees Planted 56 <br />Total Trees Planted or <br />Preserved <br /> 116