Laserfiche WebLink
Ms. Katie Larsen <br />03/06/2024 <br />Page 2 <br />Lino Lake Tech Center Engineering Review <br />1.Provide a grading plan meeting City requirements. <br />(Amcon 11/13/2023) Understood, Civil drawings will be provided for the full Site & <br />Building Plan Submittal after this Concept Submittal approval. <br />(WSB 11/29/2023) To be reviewed at the time of full submittal <br />(WSB 3/6/2024) Submitted <br />2.The applicant shall note that site grading work shall be done in accordance with the <br />approved MPCA Response Action Plan (RAP) and Contingency Construction Plan <br />(CCP). Provide updated documentation regarding the current state of the RAP. <br />(Amcon 11/13/2023) A copy of the RAP & CCP document, dated Aug. 27, 2018 is <br />included for your review. The owner did have the site cleaned up, please refer to City <br />of Lino Lakes Permit #2021-02485. Junk & debris that had been dumped on the site <br />was removed & existing concrete debris was properly recycled. <br />Amcon (2/6/2024) We have engaged Braun Intertec to perform a Soil Vapor <br />Investigation. We are requesting that the Planning Commission & City Council have <br />this as a condition of approval. See attached EXHIBIT #3 to review Braun Intertec’s <br />proposal and timing to perform this work. <br />(WSB 3/6/2024) the RAP & CCP MPCA approvals should be provided to the City <br />prior to City Council approval. <br />3.(WSB 3/6/2024) Applicant to revise slopes on BMP to a maximum of 3:1. <br />4.(WSB 3/6/2024) Applicant to call out EOFs of all low points to ensure appropriate <br />freeboard is provided to proposed and existing structures. <br />a.Minimal freeboard (1') between FFE (903.50) and EOF (902.5) for the catch <br />basin on the east side of the building. <br />i.Care will need to be taken that this area is not blocked with snow <br />(shown as snow storage) during thawing/ periods of heavier rain. <br />5.(WSB 3/6/2024) Correct the direction of the flow arrows shown on the storm sewer <br />pipes. <br />6.(WSB 3/6/2024) Verify the amount of drainage being contributed from the existing <br />storage area to the north of the site. <br />•Stormwater Management <br />The stormwater management for the Lino Lakes Tech Center consists of the installation of <br />storm sewer structures and pipes to convey the site’s runoff to a new BMP (basin) on the <br />west side of the parcel. The runoff is generated from the one 36,040 square foot storage <br />building and associated driveway and parking that is proposed to be constructed on the site. <br />The development of the site will result in 0.156 acres of reconstructed impervious, and 1.329 <br />acres of new impervious for a total of 1.485 acres of total impervious. <br />Comments: <br />1.The applicant shall provide an updated Stormwater Management Report <br />demonstrating the appropriate sizing and treatment for the expansion. <br />(Amcon 11/13/2023) Understood, Civil drawings will be provided for the full Site & <br />Building Plan Submittal after this Concept Submittal approval. <br />(WSB 11/29/2023) To be reviewed at the time of full submittal.