My WebLink
|
Help
|
About
|
Sign Out
Home
Search
03/13/2024 PZ Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2024
>
03/13/2024 PZ Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2024 10:11:20 AM
Creation date
3/8/2024 9:53:42 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
03/13/2024
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />03/06/2024 <br />Page 6 <br />Lino Lake Tech Center Engineering Review <br />(WSB 3/6/2024) Submitted <br />3.The applicant shall note if curb & gutter will be used <br />(Amcon 11/13/2023) Incomplete sentence from WSB review, dated 7/5/23. Curb & <br />gutter is shown in the proposed site plan. <br />(WSB 11/29/2023) Label curb and gutter style and identify areas of tipout curb with <br />full submittal <br />(WSB 3/6/2024) Complete <br />4.(WSB 3/6/2024) There is limited turning movements and access for all potential <br />vehicles to the 3 bays at the south end of the parking area <br />a.Stop the parking area shorter and extend a sidewalk down for the remaining <br />bays. <br />b.Shift the south eastern snow storage to the newly created green space out of <br />the current EOF route <br />5.(WSB 3/6/2024) The curb transition location in the northeast corner of the site is not <br />practical for snow storage considering its proximity to the existing building. <br />6.(WSB 3/6/2024) Consider wheel stops for parking against the building without curb. <br />7.(WSB 3/6/2024) Identify ADA access to the north side of the building. <br />•Wetlands and Mitigation Plan <br />Wetlands are shown on the existing survey for the site. <br />Comments: <br />1.The existing wetland is not in the Wetland Mapping Corridor (WMC) <br />2.The minimum (10’) wetland buffer is shown on the site plans. <br />3.Grading for the stormwater pond is proposed within the minimum wetland buffer, to <br />be revegetated with a native seed mix. <br />•Landscaping <br />Landscaping plans were not provided as part of the submittal. The City’s Environmental <br />Coordinator to review landscaping and provide in-depth comments when provided <br />(Amcon 11/13/2023) Understood, Civil & Landscape drawings will be provided for the full <br />Site & Building Plan Submittal after this Concept Submittal approval. <br />(WSB 11/29/2023) To be reviewed at the time of full submittal <br />(WSB 3/6/2024) Comments to be provided by the City’s Environmental Coordinator <br />Comments: <br />1.(WSB 3/6/2024) No landscaping is allowed in the basin’s High Water Level HWL <br />(901.75) <br />•Floodplain <br />No floodplain impacts are proposed on site.
The URL can be used to link to this page
Your browser does not support the video tag.