My WebLink
|
Help
|
About
|
Sign Out
Home
Search
03/13/2024 PZ Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2024
>
03/13/2024 PZ Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2024 10:11:20 AM
Creation date
3/8/2024 9:53:42 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
03/13/2024
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br /> <br />Watermark 7th Addition <br />Total # Units = 106 <br />x Park Dedication Fee $3,300 <br />= Cash in Lieu Value $349,800 <br />(Trail Construction Costs) ($150,350) <br />(Land dedication value (Outlot G, Watermark 7th) ($39,906) <br />TOTAL CASH FEE DUE = $159,544 <br /> <br />Wetlands <br /> <br />Wetland delineations were approved by RCWD and USACE in 2015. The delineation identified <br />28 wetlands totaling approximately 20 acres in size. The original approved WCA Sequencing <br />Application proposed wetland impacts, wetland creation, wetland restoration and upland <br />buffer establishment. In April 2018, the developer revised the application to purchase 3.3671 <br />acres of wetland banking credits as the proposed compensatory mitigation action. The wetland <br />fill, impacts and mitigation (wetland bank credits) occurred within the Phase I grading limits and <br />are complete. <br /> <br />In December 2020, the developer submitted another Wetland Replacement Plan to RCWD for <br />the balance of the site. Phase 3 grading impacts 5.9784 acres of wetland which require a 1:1 <br />mitigation. The plan was to buy wetland credits for mitigation; however, viable wetland <br />restoration and creation opportunities exist within Phase 3; therefore, onsite restoration and <br />creation will be used for mitigation. This is consistent with the Parks and Open Space Plan and <br />the establishment of the greenway corridor including wetlands, trails and open space. <br /> <br />To date, wetland mitigation and restoration has been completed on Wetland Restoration Area <br />RA1. Wetland RA2 and RA3 are partially graded and restoration will be substantially completed <br />in 2024. <br /> <br />Open Space Easement <br /> <br />Section 7.2 of the Watermark Master Development Agreement states the owner shall provide <br />the City with a perpetual open space easement. The easement protects the parks, open space, <br />wetlands etc. from any land disturbance that is not consistent with the Restoration and <br />Management Plan. Currently, a “blanket” easement is in place that covers all outlots in
The URL can be used to link to this page
Your browser does not support the video tag.