My WebLink
|
Help
|
About
|
Sign Out
Home
Search
03/13/2024 PZ Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2024
>
03/13/2024 PZ Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2024 10:11:20 AM
Creation date
3/8/2024 9:53:42 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
03/13/2024
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
178 E 9TH STREET | SUITE 200 | SAINT PAUL, MN | 55101 | 651.286.8450 | WSBENG.COM Memorandum <br />To: Katie Larsen, Lino Lakes City Planner <br />From: Kris Keller PE, WSB <br />Henry Meeker EIT, WSB <br />Diane Hankee PE, Lino Lakes City Engineer <br />Date: March 6, 2024 <br />Re: Watermark 7th Addition <br />Final Plat & Construction Plan Review <br />024693-000 <br />As requested by City staff, WSB reviewed the Final Plat and Construction Plans for the <br />Watermark 7th Addition in Lino Lakes, MN, prepared by Carlson McCain and received February 8, <br />2024. Our comments were made on the following documents: <br />•Watermark 7th Addition Plat prepared by Carlson McCain, received February 8, 2024. <br />•Watermark 7th Addition Sanitary Sewer, Water Main, Storm Sewer, and Street <br />Construction Plans prepared by Carlson McCain, dated January 26, 2024, received <br />February 8, 2024. <br />•Watermark Grading Plans prepared by Carlson McCain, revised January 26, 2024, <br />received February 8, 2024. <br />•Watermark 7th Addition Landscaping Plans, prepared by Carlson McCain, dated January <br />26, 2024, received February 8, 2024. <br />The following review comments should be responded to in writing by the applicant. <br />Engineering <br />•Grading <br />The Watermark 7th Addition is part of the Phase 3 grading. The Watermark 7th Addition <br />includes site grading for Rainy Lane, Lotus Lane, Traverse Drive, Pepin Drive, Swan <br />Street, and Mille Lacs Lane. <br />Comments: <br />1.Lot 3 of Block 6 on Lotus Lane does not have sufficient freeboard to the <br />HWL of Pond 1000 to the north. The HWL of 907.9 is above the low floor <br />elevation of 906.5 and less than 2’ below the low entry elevation of 909. <br />2.Shift the storm sewer in the back of Block 8 closer to the rear property line to <br />provide additional usable backyard area. <br />•Look to replace the inlet FES with A CBMH. <br />•Verify amount of drainage coming or going to the northern property line <br />Attachment 1: City Engineer Memo dated March 6, 2024
The URL can be used to link to this page
Your browser does not support the video tag.