Laserfiche WebLink
FIRST FLOOR <br />100' - 0" <br />T.O. EXIST. CMU <br />124' - 0" <br />T.O. ROOF (LOW) <br />123' - 9" <br />T.O. ROOF (HIGH) <br />126' - 2" <br />NEW CONSTRUCTION EXISTING BUILDING <br />FIRST FLOOR <br />100' - 0" <br />T.O. EXIST. CMU <br />124' - 0" <br />T.O. ROOF (HIGH) <br />126' - 2" <br />KINGSPAN GRANITSTONE INSULATED WALL PANEL <br />ROCK FACE CMU <br />ALUMINUM WINDOW <br />EXISTING CMU <br />BUTLER METAL ROOF TRIM <br />NEW CONSTRUCTIONEXISTING BUILDING <br />FIRST FLOOR <br />100' - 0" <br />T.O. ROOF (LOW) <br />123' - 9" <br />T.O. ROOF (HIGH) <br />126' - 2" <br />© 2023 Copyright Studio EA, LLC. All rights reserved.STUDIO EA| 76 coulee road, hudson, wi 54016 | WeAreStudioEA.com | 715.386.8303 <br />1/8" = 1'-0" <br />RICE INDUSTRIES EXTERIOR ELEVATIONS <br />12-11-2023 <br />1/8" = 1'-0"2 EAST ELEVATION <br />1/8" = 1'-0"1 WEST ELEVATION <br />1/8" = 1'-0"3 SOUTH ELEVATION <br />1/8" = 1'-0"4 NORTH ELEVATION <br />NEW CONSTRUCTION MATERIAL PERCENTAGES <br />ROCK FACE CMU 21% <br />ALUMINUM WINDOW 4% <br />KINGSPAN GRANITSTONE 75% <br />112