My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01-08-2024 Council Meeting Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2024
>
Searchable Packets
>
01-08-2024 Council Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2024 2:42:29 PM
Creation date
3/18/2024 2:35:12 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
01/08/2024
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIRST FLOOR <br />100' - 0" <br />T.O. EXIST. CMU <br />124' - 0" <br />T.O. ROOF (LOW) <br />123' - 9" <br />T.O. ROOF (HIGH) <br />126' - 2" <br />NEW CONSTRUCTION EXISTING BUILDING <br />FIRST FLOOR <br />100' - 0" <br />T.O. EXIST. CMU <br />124' - 0" <br />T.O. ROOF (HIGH) <br />126' - 2" <br />KINGSPAN GRANITSTONE INSULATED WALL PANEL <br />ROCK FACE CMU <br />ALUMINUM WINDOW <br />EXISTING CMU <br />BUTLER METAL ROOF TRIM <br />NEW CONSTRUCTIONEXISTING BUILDING <br />FIRST FLOOR <br />100' - 0" <br />T.O. ROOF (LOW) <br />123' - 9" <br />T.O. ROOF (HIGH) <br />126' - 2" <br />© 2023 Copyright Studio EA, LLC. All rights reserved.STUDIO EA| 76 coulee road, hudson, wi 54016 | WeAreStudioEA.com | 715.386.8303 <br />1/8" = 1'-0" <br />RICE INDUSTRIES EXTERIOR ELEVATIONS <br />12-11-2023 <br />1/8" = 1'-0"2 EAST ELEVATION <br />1/8" = 1'-0"1 WEST ELEVATION <br />1/8" = 1'-0"3 SOUTH ELEVATION <br />1/8" = 1'-0"4 NORTH ELEVATION <br />NEW CONSTRUCTION MATERIAL PERCENTAGES <br />ROCK FACE CMU 21% <br />ALUMINUM WINDOW 4% <br />KINGSPAN GRANITSTONE 75% <br />112
The URL can be used to link to this page
Your browser does not support the video tag.