Laserfiche WebLink
4. The tree planting detail on the Landscape Plan (Sheet L1) shall include comments about <br /> exposing root flare so it is visibly at grade to ensure trees are installed at proper depth, <br /> and that mulch is pulled back 3 inches from the trunk(mulch is not left touching the <br /> trunk). <br /> 5. Seed mix for ground cover must be specified on the Landscape Plan and Grading, <br /> Drainage, and Erosion Control Plan. <br /> 6. A construction exit will be required for Lot 2 unless all construction access will be routed <br /> through Lot 1. <br /> 7. Inlet protection will be needed for the up-gradient flared-end sections west of the two <br /> driveways. <br /> ATTACHMENTS <br /> 1. Preliminary Plat (Sheet S2) <br /> 2. Tree Inventory with Removals (Sheet S3) <br /> 3. Landscape Plan (Sheet L1) <br /> 4. Grading, Drainage, and Erosion Control Plan (Sheet C1.1) <br /> 6 <br />