Laserfiche WebLink
Ms. Katie Larsen <br />05/01/2024 <br />Page 2 <br />Linda Avenue Addition Engineering Review <br />•Stormwater Management <br />Stormwater management is not required under City ordinance. Anoka County Highway <br />Department (ACHD) requires drainage calculations and that the post-developed <br />rate/volume of runoff must not exceed the pre-developed rate/volume of runoff for the 10- <br />year storm event. <br />•Water Supply <br />The proposed water will be supplied by two existing 1-inch Type K copper services <br />extended to the lots from Linda Avenue. <br />Comments: <br />1.Verify the existing well has been abandoned/sealed per MDH requirements <br />prior to construction. <br />•Note the existing well may be left in place for non-potable irrigation use <br />if MDH setbacks can be met from the proposed utility services. <br />2.Locate the existing curb stops for both houses. <br />•City Public Works requires that both curb stops be replaced. <br />•Sanitary Sewer <br />The proposed sanitary sewer will be supplied by two existing 4-inch diameter Schedule 40 <br />PVC gravity service pipes extended to the lots from Linda Avenue. <br />Comments: <br />1.Provide proof to the City that the existing septic system has been removed <br />per Anoka County requirements prior to construction <br />•Transportation <br />There is minimal impact to traffic or roads as this development simply splits the existing <br />single-family lot into two smaller single family lots which will not generate significantly <br />more traffic. <br />•Trails and sidewalks <br />There are no existing trails or sidewalks adjacent to the proposed development with <br />none being proposed. <br />•Wetlands and Mitigation Plan <br />Wetlands on the site were delineated and a WCA Notice of Decision was provided. There <br />are no wetland impacts proposed with the project. <br />•Landscaping