My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/08/2024 PZ Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2024
>
05/08/2024 PZ Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 2:42:49 PM
Creation date
5/3/2024 2:37:17 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
05/08/2024
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />05/01/2024 <br />Page 3 <br />Linda Avenue Addition Engineering Review <br />The Linda Avenue Addition Site Landscape Plan will be reviewed by staff and the City’s <br />Environmental Coordinator. The Environmental Coordinator will provide separate comments. <br />•Floodplain <br />The Linda Avenue Addition does not impact floodplain. <br />•Drainage and Utility Easements <br />The only existing easement for the lot is a United Power Association easement along the <br />southern 35’ feet of the lot which is to remain across both proposed lots. <br />•The proposed Lot 1 will have 10’ in the front, 5’ on the sides, and the 35’ UPA <br />easement in the back. <br />•The proposed Lot 2 will have 10’ in the front, 5’ on the side common with Lot 1, <br />10’ on the side common to Hodgson Road/CSAH 49 and the 35’ UPA easement <br />in the back. <br />•The applicant is dedicating a drainage and utility easement over the back 35’. <br />This would in the same location as the UPA easement and permissions maybe <br />required. <br />Note that the eastern 17’ of the parent lot will be dedicated for the Hodgson/ CSAH <br />49 right of way. Anoka County is requiring 27’ (60’ total) dedicated right of way west <br />of centerline. <br />•Development Agreement <br />A development agreement will be required with the final plat. <br />•Grading Agreement <br />No grading agreement is required for this site. <br />•Stormwater Maintenance Agreement <br />No stormwater maintenance declaration agreement is required for this site. <br />•Permits Required <br />1.City of Lino Lakes Zoning Permit for Construction <br />2.NPDES General Construction Permit <br />3.Anoka County Highway Department (ACHD) permit (if <br />necessary) <br />If you or the applicant have any questions regarding these comments, please contact Kris <br />Keller at (612) 419-3083 or kkeller@wsbeng.com. You may also contact Diane Hankee at (651) <br />982-2430 or dhankee@linolakes.us.
The URL can be used to link to this page
Your browser does not support the video tag.