My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/08/2024 PZ Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2024
>
05/08/2024 PZ Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 2:42:49 PM
Creation date
5/3/2024 2:37:17 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
05/08/2024
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 <br />To: Katie Larsen <br />From: Andy Nelson <br />Date: 4/29/24 <br />Re: Environmental Comments/4-24-24/Linda Avenue Addition Preliminary Plat <br />Environmental Board had the following comments at the 4/24/24 EB meeting: <br />1.A 6-foot buffer and screen will be required for the east perimeter abutting Hodgson <br />Road. This screen can be trees, shrubs, a fence, or some combination of these as <br />described in City Code Section 1007.049 (6)(b). <br />2.Remove 7 additional Emerald ash borer infested trees from the site (all ash on the <br />inventory will be removed). <br />3.The trees planned for preservation on the west perimeter must have Tree Protection <br />Zones installed in accordance with the City Tree Protection Fence Detail. This is noted <br />on the Grading, Drainage, and Erosion Control Plan (Sheet C1.1). The same note must <br />be added to the Landscape Plan (Sheet L1) in place of landscaping note #3. <br />4.The tree planting detail on the Landscape Plan (Sheet L1) shall include comments about <br />exposing root flare so it is visibly at grade to ensure trees are installed at proper depth, <br />and that mulch is pulled back 3 inches from the trunk (mulch is not left touching the <br />trunk). <br />5.Seed mix for ground cover must be specified on the Landscape Plan and Grading, <br />Drainage, and Erosion Control Plan. <br />6.A construction exit will be required for Lot 2 unless all construction access will be routed <br />through Lot 1. <br />7.Inlet protection will be needed for the up-gradient flared-end sections west of the two <br />driveways. <br />Environmental Memo <br />Attachment 3: Environmental Coordinator memo dated April 29, 2024
The URL can be used to link to this page
Your browser does not support the video tag.