Laserfiche WebLink
6 <br />The lots are within the Shoreland Management Overlay district of Centerville <br />Lake, which is a Recreational Development lake. Both lots are connected to City <br />of Centerville municipal sanitary sewer. Shoreland lot sizes, setbacks and <br />impervious surface requirements are met. <br /> <br />Impervious Surface Coverage <br /> <br />As detailed above under Zoning Requirements, impervious surface requirements <br />are met for both lots. <br /> <br /> Shoreland <br />Requirements Lot 1 Lot 2 <br />Impervious Surface Maximum 30% 15.9% 13.4% <br /> <br />Traffic Study <br /> <br />A traffic study is not required for a lot line adjustment between two (2) existing <br />houses. <br /> <br />Additional City and Government Agency Review Comments <br /> <br />Public Safety Comments <br /> <br />Lino Lakes Public Safety Department-Police Division and Fire Division reviewed <br />the proposed lot line adjustment and had no comments. <br /> <br />Environmental Coordinator <br /> <br />The Environmental Coordinator had no concerns with the proposed lot line <br />adjustment. <br /> <br />City of Centerville <br /> <br />The City of Centerville is processing the lot line adjustment under their ordinance <br />requirements. <br /> <br />Agreements <br /> <br />Stormwater Maintenance Agreement <br /> <br />A stormwater maintenance agreement is not required since a stormwater <br />management plan is not required per City Code Chapter 1010. <br /> <br />Development Agreement <br />