My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04-22-2024 Council Meeting Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2024
>
Searchable Packets
>
04-22-2024 Council Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2024 3:00:29 PM
Creation date
5/14/2024 2:54:58 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
04/22/2024
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />04/10/2024 <br />Page 7 <br />Lino Lake Tech Center Engineering Review <br /> <br /> <br />• Sanitary Sewer <br /> <br />Sanitary sewer service is shown being supplied for the site by extending an 8” sanitary <br />sewer main along the west side of Lake Drive/CSAH 23 to the southern site limits. A 6” <br />sanitary sewer service will be connected to the sanitary sewer main at a proposed <br />manhole. <br /> <br />Utilities are not proposed or shown for the site. Sanitary sewer maybe required <br />depending on use. <br />(Amcon 11/13/2023) Understood, Civil drawings will be provided for the full Site & Building <br />Plan Submittal after this Concept Submittal approval. <br />(WSB 11/29/2023) Based on the proposed use of bathrooms, sanitary sewer will be <br />required to be extended along Lake Drive to the site <br />(WSB 3/6/2024) Submitted <br /> <br />Comments: <br /> <br />1. (WSB 3/6/2024) Field verify size and depth of sanitary sewer stub <br />a. Initially assume 8" PVC SDR 26 per as-built <br />b. Sanitary sewer main to be SDR 26 <br />(Elan 3/26/2024) The elevation of the new line will be adjusted as needed based on <br />the elevation of the existing stub. The plans have been changed to SDR 26. <br />(WSB 4/5/2024) Complete <br /> <br />2. (WSB 3/6/2024) Sanitary sewer service pipe to be Schedule 40 <br />(Elan 3/26/2024) The sewer service pipe is called out in the sheet notes to be <br />Schedule 40. <br />(WSB 4/5/2024) Complete <br /> <br />3. (WSB 3/6/2024) Outside drop should reference City Standard Detail Plate SAN-4 <br />(Elan 3/26/2024) The detail has been changed to plate SAN-4 and is referenced on <br />C-301. <br />(WSB 4/5/2024) Complete <br /> <br /> <br /> <br />• Transportation <br /> <br />Lino Lakes Tech Center proposes connecting to the existing storage site to the north for <br />access off of Park Court with paved private access to each of the units throughout the <br />site. The 2003 EAW analyzed this parcel as a light industrial user with two (2) <br />professional office buildings totally 28,800 sf. The existing mini self-storage facility <br />together with the Tech Center will produce less traffic than two professional office <br />buildings and therefore, is consistent with the EAW findings. No adverse traffic impacts <br />are anticipated and a traffic study is not required. <br /> <br />There should be no site access off of Lake Drive per Anoka County Access Policy. <br /> <br />Comments: <br />120
The URL can be used to link to this page
Your browser does not support the video tag.