Laserfiche WebLink
Ms. Katie Larsen <br />04/10/2024 <br />Page 9 <br />Lino Lake Tech Center Engineering Review <br />crosshatched area in front of the door exceeds the requirement for an accessible <br />stall. If the tenant requires an accessible stall, they will be able use the area directly <br />adjacent to their space. The slopes have been adjusted to comply with ADA. This is <br />deemed a better solution than showing an accessible route from the designated stalls <br />across the stoops of each space to the northeast corner of the building. <br />(WSB 4/5/2024) City to verify ADA access requirements are met <br /> <br /> <br />• Wetlands and Mitigation Plan <br /> <br />Wetlands are shown on the existing survey for the site. <br /> <br />Comments: <br />1. The existing wetland is not in the Wetland Mapping Corridor (WMC) <br />2. The minimum (10’) wetland buffer is shown on the site plans. <br />3. Grading for the stormwater pond is proposed within the minimum wetland buffer, to <br />be revegetated with a native seed mix. <br /> <br /> <br />• Landscaping <br /> <br />Landscaping plans were not provided as part of the submittal. The City’s Environmental <br />Coordinator to review landscaping and provide in-depth comments when provided <br />(Amcon 11/13/2023) Understood, Civil & Landscape drawings will be provided for the full <br />Site & Building Plan Submittal after this Concept Submittal approval. <br />(WSB 11/29/2023) To be reviewed at the time of full submittal <br />(WSB 3/6/2024) Comments to be provided by the City’s Environmental Coordinator <br /> <br />Comments: <br />1. (WSB 3/6/2024) No landscaping is allowed in the basin’s High Water Level HWL <br />(901.75) <br />(Elan 3/26/2024) The trees in this area are located on the wetland side of the berm. <br />(WSB 4/5/2024) Complete. <br /> <br />• Floodplain <br /> <br />No floodplain impacts are proposed on site. <br /> <br /> <br />• Drainage and Utility Easements <br /> <br />Drainage and utility easements are required for stormwater systems. <br />(Amcon 11/13/2023) Understood, Civil drawings will be provided for the full Site & Building <br />Plan Submittal after this Concept Submittal approval. <br />(WSB 11/29/2023) To be reviewed at the time of full submittal <br />(WSB 3/6/2024) Easements to be provided and approved prior to City Council approval. <br />(Elan 3/26/2024) Understood <br /> <br /> <br />• Development Agreement <br /> <br />A Development Agreement will not be required. <br />122