My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04-22-2024 Council Meeting Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2024
>
Searchable Packets
>
04-22-2024 Council Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2024 3:00:29 PM
Creation date
5/14/2024 2:54:58 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
04/22/2024
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> <br />CITY COUNCIL <br />REGULAR MEETING STAFF REPORT <br />AGENDA ITEM 6C <br /> <br />STAFF ORIGINATOR: Veronica Kubicek, PE Project Engineer <br /> <br />MEETING DATE: April 22, 2024 <br /> <br />TOPIC: Consider Resolution 24-37, Accepting Bids, Awarding a <br />Construction Contract for the 2024 Rejuvenator Project <br /> <br />VOTE REQUIRED: 3/5 <br />______________________________________________________________________________ <br /> <br />INTRODUCTION <br /> <br />Staff is requesting Council approval to accept bids and award a construction contract for the <br />2024 Rejuvenator Project. <br /> <br />BACKGROUND <br /> <br />On March 25th, 2024 the City Council ordered the project and authorized the advertisement for <br />bid for the 2024 Rejuvenator Project. <br />The Street Maintenance Project includes applying a maltene-based asphalt rejuvenator. <br />Rejuvenators are a product many Cities are using in lieu of seal coating. The City has completed <br />three rejuvenator projects the past. As part of this project, the maltene-based product will be <br />placed on the streets, followed by a sand so vehicles can still drive over it. The rejuvenator <br />maintenance project includes the following: <br />Area A: 4th Ave <br />Area B: Forsham Lake Dr, Stage Coach Tr, Post Rd <br />Area C: W Shadow Lake, Shadow Ct , Sandpiper Dr, <br />Area D: Fox Rd <br />Area E: Joyer Ln, Karth Rd, Talle Ln, Canfield, Gaage Ln <br />Area F: Dogwood St, Ivywood Ave, Butternut St <br />Area G: 21st Ave, Crane Dr, Balsam Way, Diamond Ln, Forest, Eden Cir, Emily Cir, <br />Watermark Way, Harriet Ln, Geneva Ct, Itasca Cir, Johanna Cir, Cass Dr, Ada Dr, Bay Dr, <br />Jasper Ct, Island Ct, Heron Ct, Gull Dr, Dora Dr, Elmo Ct, Fall Dr <br /> <br />Bids were received on Wednesday, April 17, 2024. A total of 2 bids were received and are <br />summarized in the following table: <br />71
The URL can be used to link to this page
Your browser does not support the video tag.