Laserfiche WebLink
CMT <br />Unit <br /> Hourly or <br />Unit Cost <br /> Total Unit <br />Cost <br />CMT03 60.00 hours 130.00$ 7,800.00$ <br />20 trips at 3.00 hours each <br />CMT02 47.50 hours 105.00$ 4,987.50$ <br />19 trips at 2.50 hours each <br />3510 52 tests 25.00$ 1,300.00$ <br />25 tests <br />4 tests <br />8 tests <br />12 tests <br />3 tests <br />3500 5 tests 55.00$ 275.00$ <br />5 tests <br />CMT04 10.5 hours 140.00$ 1,470.00$ <br />3 trips at 3.50 hours each <br />CMT01 6.00 hours 90.00$ 540.00$ <br />3 trips at 2.00 hours each <br />2160 45 trips 60.00$ 2,700.00$ <br />3025 3 tests 165.00$ 495.00$ <br />1 tests <br />1 tests <br />1 tests <br />3260 5 tests 165.00$ 825.00$ <br />1 tests <br />1 tests <br />3 tests <br />Subtotal 20,392.50$ <br />9762 5.00 hours 320.00$ 1,600.00$ <br />2 trips at 2.50 hours each <br />CMT01 4.00 hours 90.00$ 360.00$ <br />2 trips at 2.00 hours each <br />2160 4 trips 60.00$ 240.00$ <br />2-Man Coring Crew <br />Trip Charge <br />Asphalt Pavements <br />Field Testing <br />Sample Pick Up <br />on granular borrow <br />Trip Charge <br />Sample Pick Up <br />on aggregate base <br />on granular borrow <br />Field Testing <br />Construction Materials Testing Estimate of Costs <br />City of Lino Lakes <br />Water Treatment Plant <br />R-021336-000 <br />June 12, 2024 <br />Service Description Estimated Units <br />Aggregate and Soils <br />Standard Proctor <br />on structural backfill <br />on slab subbase <br />on trench backfill <br />Excavation Observations <br />Compaction Testing of Fill and Backfill <br />Nuclear Density Testing <br />Dynamic Cone Penetrometer (DCP) <br />on structural backfill <br />on granular borrow <br />on subgrade <br />on retaining wall backfill <br />Laboratory Testing <br />on aggregate base <br />Test Rolling <br />on structural backfill <br />Sieve Analysis through no. 200 Sieve <br />90 of 99