My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06-24-2024 Council Meeting Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2024
>
Searchable Packets
>
06-24-2024 Council Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2024 4:19:11 PM
Creation date
6/26/2024 4:11:22 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/24/2024
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4080 4 tests 60.00$ 240.00$ <br />4090 2 tests 650.00$ 1,300.00$ <br />Subtotal 3,740.00$ <br />CMT03 130.00 hours 130.00$ 16,900.00$ <br />Footings 30 trips at 1.00 hours each <br />Walls 55 trips at 1.00 hours each <br />Columns 25 trips at 1.00 hours each <br />Slabs 20 trips at 1.00 hours each <br />2160 0 trips 60.00$ -$ <br />Subtotal 16,900.00$ <br />CMT02 350.00 hours 105.00$ 36,750.00$ <br />Footings 30 pours at 2.50 hours each <br />Walls 55 pours at 2.50 hours each <br />Columns 25 pours at 2.50 hours each <br />Slabs 20 pours at 2.50 hours each <br />Exterior 10 pours at 2.50 hours each <br />2114 4 days 295.00$ 1,180.00$ <br />CMT04 12.00 hours 140.00$ 1,680.00$ <br />4 trips at 3.00 hours each <br />CMT01 168.00 hours 90.00$ 15,120.00$ <br />84 trips at 2.00 hours each <br />2160 228 trips 60.00$ 13,680.00$ <br />2040 560 cylinders 35.00$ 19,600.00$ <br />140 sets at 4 cylinders each <br />Subtotal 88,010.00$ <br />CMT03 24.00 hours 130.00$ 3,120.00$ <br />6 trips at 4.00 hours each <br />CMT01 8.00 hours 90.00$ 720.00$ <br />4 trips at 2.00 hours each <br />2160 10 trips 60.00$ 600.00$ <br />2050 12 tests 35.00$ 420.00$ <br />4 tests with 3 samples each <br />2055 16 tests 60.00$ 960.00$ <br />4 tests with 4 samples each <br />2070 12 tests 185.00$ 2,220.00$ <br />4 tests with 3 samples each <br />Subtotal 8,040.00$ <br />CMT03 24.00 hours 130.00$ 3,120.00$ <br />8 trips at 3.00 hours each <br />2160 8 trips 60.00$ 480.00$ <br />Subtotal 3,600.00$ <br />Sample Pickup <br />Masonry <br />Field Testing <br />Laboratory Testing <br />Concrete Curing and Compressive Strength Testing <br />Laboratory Testing <br />Compressive Strength Testing of Mortar <br />Trip Charge <br />Adhesive Anchors <br />Field - Inspection & Observation <br />Trip Charge <br />Trip Charge <br />Masonry Sample Pick Up <br />Compressive Strength Testing of CMU Blocks <br />Core Thickness and Density Testing <br />Laboratory Testing <br />Compressive Strength Testing of Grout Prisms <br />Concrete Reinforcement Observations <br />Concrete Reinforcement <br />Masonry Observations and Testing <br />Field Testing <br />MnDOT Gyratory Mix Properties <br />Concrete <br />Floor Flatness/Levelness - Equipment Rental <br />Floor Flatness/Levelness Testing <br />Testing of Concrete <br />Trip Charge <br />91 of 99
The URL can be used to link to this page
Your browser does not support the video tag.