Laserfiche WebLink
CMT04 90.00 hours 140.00$ 12,600.00$ <br />15 trips at 6.00 hours each <br />2160 15 trips 60.00$ 900.00$ <br />Subtotal 13,500.00$ <br />CMT04 20.00 hours 140.00$ 2,800.00$ <br />8 trips at 2.50 hours each <br />2160 8 trips 60.00$ 480.00$ <br />Subtotal 3,280.00$ <br />CMT80 20.00 hours 205.00$ 4,100.00$ <br />CMT70 80.00 hours 165.00$ 13,200.00$ <br />CMT90 1.00 hours 90.00$ 90.00$ <br />Subtotal 17,390.00$ <br />20,392.50$ <br />3,740.00$ <br />16,900.00$ <br />88,010.00$ <br />8,040.00$ <br />3,600.00$ <br />13,500.00$ <br />3,280.00$ <br />17,390.00$ <br />174,852.50$ <br />Assumptions <br />1. All fabrications shops are certified and therefore no plant or shop inspections would be required. <br />2. Testing of nonstructural concrete toppings will not be required. <br />3. No air infiltration testing, or water penetration testing will be required on windows, doors, or barriers. <br /> 4. We assume grout testing can be conducted with cardboard prism forms. <br />5. Rebar inspections will be performed immediately prior to concrete placement and additional trips will not be required. <br />Structural Steel <br />Waterproofing <br />Thickness Testing and Inspection <br />Trip Charge <br />Field - Inspection and Testing <br />Project Engineer/Manager <br />Project Supervision, Review and Management <br />Project Supervision, Review and Management <br />Inspection and Testing Project Summary <br />Structural Steel <br />Estimated Total <br />Asphalt Pavements <br />Concrete Reinforcement <br />Concrete <br />Masonry <br />Aggregate and Soils <br />Trip Charge <br />Project Assistant <br />Project Administrator <br />Adhesive Anchors <br />Waterproofing <br />92 of 99