Laserfiche WebLink
2 <br /> <br />AGREEMENT <br /> NOW, THERFORE, in consideration of the mutual undertakings herein expressed, the <br />Town of White Bear and the City of Lino Lakes agree as follows: <br />1. The Town shall permit the Owner to connect with the Town sewer and water services. <br />2. Construction and maintenance of the sewer and water lines shall be subject to the <br />provisions of Town Ordinance No. 12 regarding the water line and Ordinance No. 18 <br />regarding the sewer line, as amended from time to time. And said sewer and water lines <br />shall be constructed according to plans and specifications approved by the Township. <br />3. The Owner agrees to pay the following fees to the Town: <br />Prevailing Utility Connection Fees <br />Water Connection Fee $9,950.00 <br />Sewer Connection Fee $9,950.00 <br /> <br />4. The following fees will be charged per Unit per the Metropolitan SAC determination. <br />Payments to be made within 30 days of notification from Met Council. <br />Prevailing Local Water Availability <br />Charge (currently per Unit) <br />$2,440.00 <br />Prevailing Local Sewer Availability <br />Charge (currently per Unit) <br />$600.00 <br />Additional Fees and/or Permits: <br />Sewer and Water Permit Fee <br />Water Meter Cost <br /> <br />$103.00 <br />$418.03 <br /> <br />5. In the event construction of the water and/or sewer lines require the opening of a road <br />maintained by the Town. Then in that event the Owner shall be responsible for the cost of <br />restoring the road surface to the same condition as existed prior to the opening. <br />6. The Owner shall be responsible for any repairs or maintenance to the sanitary sewer line <br />up to the Town sewer main line, in accordance with Section 5 of Ordinance No. 18.