My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08/14/2024 PZ Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2024
>
08/14/2024 PZ Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2024 2:19:26 PM
Creation date
8/22/2024 2:18:21 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
08/14/2024
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
178 E 9TH STREET | SUITE 200 | SAINT PAUL, MN | 55101 | 651.286.8450 | WSBENG.COM Memorandum <br />To: Katie Larsen, Lino Lakes City Planner <br />From: Kris Keller PE, WSB <br />Henry Meeker EIT, WSB <br />Diane Hankee PE, Lino Lakes City Engineer <br />Date: August 7, 2024 <br />Re: Watermark 8th Addition <br />Final Plat & Construction Plan Review <br />026120-000 <br />As requested by City staff, WSB reviewed the Final Plat and Construction Plans for the <br />Watermark 8th Addition in Lino Lakes, MN, prepared by Carlson McCain and received July 8, <br />2024. Our comments were made on the following documents: <br />•Watermark 8th Addition Plat prepared by Carlson McCain, received July 8, 2024. <br />•Watermark 8th Addition Sanitary Sewer, Water Main, Storm Sewer, and Street <br />Construction Plans prepared by Carlson McCain, dated June 26, 2024, received July 8, <br />2024. <br />•Watermark Grading Plans prepared by Carlson McCain, revised June 26, 2024, received <br />July 8, 2024. <br />The following review comments should be responded to in writing by the applicant. Additional <br />redline comments may also be found on the attached plans. <br />Engineering <br />•Grading <br />The Watermark 8th Addition is part of the Phase 3 grading. The Watermark 8th Addition <br />includes site grading for Lotus Lane, Traverse Drive, and Pepin Drive. <br />Comments: <br />1.See redline comments on attached plans. <br />•Stormwater Management <br />Stormwater management for the Watermark 8th Addition includes a storm sewer <br />conveyance system and rear yard drainage systems. <br />Comments: <br />1.A trash guard is needed at the inlet FES upstream of CBMH 654. <br />Attachment 1: City Engineer Memo dated August 7, 2024
The URL can be used to link to this page
Your browser does not support the video tag.