My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09/05/2024 EDAC Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Economic Development Advisory Committee
>
Packets
>
2024
>
09/05/2024 EDAC Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2024 12:49:01 PM
Creation date
9/5/2024 12:42:47 PM
Metadata
Fields
Template:
EDAC
EDAC Document Type
EDAC Packet
Meeting Date
09/05/2024
EDAC Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Page 4 of 4 <br />952.426.0699 + ISGInc.com <br /> <br /> <br />As shown by the above table, the project is above the maximum unit density by right, however, it is requested that the density of <br />the Signature Gateway be extended to a maximum of 12 units/acre when the entire development is observed as a collection of <br />all parcels. This request is within the maximum 15 units/acre allowed per the Signature Gateway definition, with City approval, <br />within the 2040 Comprehensive Plan. <br /> <br />PHASING AND LAND DEDICATION <br />The proposed development will be executed in multiple phases. The initial phase will be the mutli-family residential buildings <br />with an associated clubhouse, followed by the for-rent townhome units. With this initial phasing work, it is the intent of the <br />development to construct the public improvements within the public right-of-way including paving, utilities, and storm water <br />infrastructure necessary to serve the site. The right-of-way will be dedicated back to the City of Lino Lakes along with any public <br />easements needed for utility extensions. Additionally, the regional stormwater management basins will be constructed which <br />will also be utilized as re-use irrigation system for the common spaces throughout the PUD development. All the natural <br />resources that exist Wilkinson Lake and the wetlands will be dedicated to the City as Public Lands, as a new amenity to the City. <br />The newly constructed stormwater management ponds will also be dedicated to the City of Lino Lakes for Ownership and <br />Maintenance, as a regional solution to stormwater for the development adjacent to Wilkinson Lake, in lieu of multiple smaller <br />stormwater basins that incur additional maintenance cost to the City. All equipment, piping, etc required for the re-use irrigation <br />system will be privately owned and maintained by the developer. <br /> <br />The next phases of development will consist of the remaining town home units and retail/commercial development at the <br />southeast corner of the site. Following that would be the construction of the senior living residential building. The final timing <br />and phasing pattern will be coordinated with the City and will be dependent upon the market demand, but the general pattern <br />will follow residential units first followed by the commercial use at the end. <br /> <br />We appreciate the opportunity to bring this submittal package before the City of Lino Lakes Staff and the City of Lino Lakes <br />Council. We look forward to work with the City to bring a development to the community that will make an impact and statement <br />as the southeast entrance into the community. <br /> <br /> <br />Sincerely, <br /> <br /> <br />Jerremy Foss, PE <br />Civil Engineering Practice Group Leader <br />Jerremy.Foss@ISGInc.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.