My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09-23-24 City Council Agenda Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2024
>
Searchable Packets
>
09-23-24 City Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2024 5:32:05 PM
Creation date
9/20/2024 5:23:45 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
09/23/2024
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br />0 <br />0 <br />0 <br />Z <br />w <br />m <br />0 <br />C. <br />00 <br />M <br />U) <br />LO <br />Z <br />U) <br />J <br />0 <br />a <br />a <br />w <br />Z <br />Z <br />C. <br />0 <br />Cl) <br />W <br />I <br />w <br />Z) <br />Z <br />w <br />a <br />a <br />Z <br />w <br />x <br />0 <br />wsb <br />September 23, 2024 <br />City of Lino Lakes <br />Mr. Michael Grochala <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br />Re: Proposal to Complete 2025 Street Reconstruction and Sewer and Water <br />Extension Project Final Design - Construction Plans and Specifications <br />Dear Mr. Grochala: <br />WSB and Associates is providing this proposal for the design and bidding services for <br />the 2025 Street Reconstruction and Sewer and Water Extension Project. The project <br />includes street reconstruction of the following roadways: <br />• Red Maple Lane and 62nd Street (east of West Shadow Lake Drive) (0.65 miles) <br />• Elbe Street, Danube Street, and 81st Street (0.45 miles) <br />Street reconstruction includes removing the existing roadway and sub cutting to reinstall <br />the City's standard road section. Reconstruction will also include a drainage system and <br />required ponding. There is not existing drainage or ponding systems in these <br />neighborhoods currently. <br />The project also includes storm system maintenance and an overlay of the following <br />roadways: <br />Diane Street and Evergreen Trail (1 mile) <br />The proposed overlay will include maintenance of the existing drainage systems. These <br />areas have existing ponding systems however it is anticipated that pond re- <br />establishment will be required for the outlet at the east end of Evergreen Trail. <br />Based on the project scope, WSB would perform the following tasks: <br />a. Project Management <br />i. WSB will provide oversight of the project scope and budget. WSB will provide <br />effective administration of the project's schedule, cost, design and bidding. <br />b. Plan production, specifications and bidding documents <br />i. Surveyed topographic information will be used to prepare plan and profile <br />sheets for the streets. Base drawing information will also include GSOC <br />design locates, city parcel map information, and record plans. <br />ii. Final construction plans will be prepared indicating the project locations, <br />street and drainage design, municipal water system and sanitary sewer <br />extensions <br />\\metro-inet\linolakes\Shared\Community Development\Projects\Capital Improvement Projects\2025 Street Recon\Staff <br />Reports\20240923 CC Authorize Plans and Spec\3. 2025_Streets_Projects - Design Proposal.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.