Laserfiche WebLink
The engineering fee to complete the design and specifications of the 2025 Street <br />Reconstruction and Sewer and Water Extension Project is as follows: <br />Colonial Woods $215,000 <br />Pine Haven $195,000 <br />Diane St & Evergreen Tr 35,000 <br />Total $445,000 <br />This letter represents our understanding of the 2025 Street Reconstruction and Sewer <br />and Water Extension Project and the proposed scope of services. If you are in <br />agreement with the scope of services and proposed fee, please sign in the appropriate <br />space below and return one copy to us. <br />WSB & Associates, Inc. will provide a separate proposal to the City for construction <br />services once the final plans are completed and the project is bid. <br />If you have any questions about this proposal, please feel free to call me at 612-360- <br />1278. <br />Sincerely, <br />WSB & Associates, Inc. <br />V" 5V?/f <br />Mark Erichson <br />Director <br />ACCEPTANCE: <br />Brian Bourassa <br />Client Representative <br />The City of Lino Lakes hereby accepts the WSB proposal of $445,000 for services <br />outlined in this letter. <br />City of Lino Lakes <br />Name <br />Title <br />Date <br />\\metro-inet\linolakes\Shared\Community Development\Projects\Capital Improvement Projects\2025 Street Recon\Staff <br />Reports\20240923 CC Authorize Plans and Spec\3. 2025_Streets_Projects - Design Proposal.docx <br />