My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10-07-24 - Council Agenda Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2024
>
Searchable Packets
>
10-07-24 - Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2024 3:05:45 PM
Creation date
10/4/2024 2:44:09 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
10/07/2024
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />09/04//2024 <br />Page 3 <br />2. Show installation of E-One or equivalent grinder pump <br />station <br />3. Keep utility services for Lot 3 out of the low area HWL <br />• Transportation <br />There is minimal impact to traffic or roads as this development simply splits the existing <br />single-family lot into three smaller single family lots which will not generate significantly <br />more traffic. <br />• Trails and sidewalks <br />There are no existing trails or sidewalks adjacent to the proposed development with <br />none being proposed <br />• Wetlands and Mitigation Plan <br />There are no wetlands identified on the site <br />• Landscaping <br />The Slater Addition Site Landscape Plan will be reviewed by staff and the City's <br />Environmental Coordinator. The Environmental Coordinator will provide separate comments. <br />• Floodplain <br />The Slater Addition does not impact floodplain. <br />• Drainage and Utility Easements <br />The current drainage and utility easements are being maintained from the original single- <br />family corner lot (10' front (Meadow View Trail) and back; 10' north side (Lois Lane), 5' <br />south side). Additional easements have been added around the perimeter of the smaller <br />lots resulting in; <br />• The proposed Lot 1 will have 10' in the front (north), 10' on the west side, 5' on <br />the east side, and 5' easement in the back (south). <br />• The proposed Lot 2 will have 10' in the front (north), 5' on the sides, and 5' <br />easement in the back (south). <br />• The proposed Lot 3 will have 10' in the front (east), 10' on the north side, 5' on <br />the south side, and 5' easement in the back (west). <br />Comments: <br />1. Provide additional drainage and utility easement that completely contains <br />the 907.6 HWL of the low area in the northern portion of Lot 3. <br />• Development Agreement <br />A development agreement will be required with the final plat. <br />Slater Addition Engineering Review <br />
The URL can be used to link to this page
Your browser does not support the video tag.