Laserfiche WebLink
October 14, 2024 <br />wsb <br />City of Lino Lakes <br />Mr. Michael Grochala <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br />Re: Proposal to Complete 2025 Street Rehabilitation Project Design Plans and <br />Specifications <br />Dear Mr. Grochala: <br />WSB LLC. is providing this proposal for the design and bidding services for the 2025 Street <br />Rehabilitation Project. The local streets designated for rehabilitation were determined by their <br />OCI ratings established in the City's Pavement Management Study, and the scope verified by <br />o cores. A summary of the project scope is described as follows: <br />U <br />U' <br />w Mill and Overlay (approximately 1.25 miles): <br />• Coyote Trl and Ct <br />Fawn Ln (south of Birch), Beaver Trl, and Muskrat Run <br />• E. Shadow Lake Ct, White Birch Ct, and Red Birch Ct <br />CD <br />co Bid Alternates: <br />• Linden Ln <br />M Red Hawk Trl <br />• Thin Overlay of Orange St, Eva St, Olive St, and Maple St <br />The project scope includes curb and gutter replacement as necessary. Gate valves will be <br />LO renlaced within the nrniect area if thev have not heen nrevinusly renaired. Puhlic Works is also <br />— identifying miscellaneous storm sewer improvements that may be needed throughout the project <br />2 area. Based on the project scope, WSB would perform the following tasks: <br />o I. Prepare Final Project Plans <br />wFinal construction plans will be prepared indicating the project locations and plan <br />Z view sheets for the areas to be milled and overlaid. Surveyed topographic <br />2 information will be used to prepare the construction plans. Base drawing <br />information will include GSOC design locates, curb inspection, city parcel map <br />information and record plans. <br />w <br />II. Final Quantities <br />An Engineer's Opinion of Probable Cost will be completed with the final <br />construction plans. <br />w III. Prepare Permits, Specifications and Bidding Documents <br />a WSB will assist the City in preparing permit application(s) and/or approval <br />a requests and will assist the City with submitting the applications/approval <br />Xrequests to the appropriate regulatory agencies. <br />0 <br />WSB will perform an internal constructability review of the final plans, quantities, <br />and specifications. A final set of construction documents will be prepared for <br />electronic bidding. <br />\\metro-inet\linolakes\Shared\Community Development\Projects\Capital Improvement Projects\2025 Street Rehab ilitation\Staff <br />Reports\20241014 CC Authorize Plans and Spec\3. WSB Design Proposal.docx <br />