My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11-04-2024 Council Work Session Agenda Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2024
>
Searchable Packets
>
11-04-2024 Council Work Session Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2024 4:52:57 PM
Creation date
11/1/2024 4:19:29 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
11/04/2024
Council Meeting Type
Work Session Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The ACHD Engineering Plan Review process will apply to this site. The following items <br />should be submitted to Brandon Ulvenes, Engineer II, <br />Brandon. Ulvenes(a)anokacountymn.gov (checklist and payment information are available on <br />our website: https://www.anokacountymn.gov/4072/Development-Review): <br />■ Construction plans (including turn lane plans) <br />■ Utility relocation plans <br />■ Traffic Control plans <br />■ Grading and erosion control plans <br />■ Drainage calculations — Note that the post -developed rate/volume of runoff must <br />not exceed the pre -developed rate/volume of runoff for the 10-year critical design <br />storm <br />■ ACHD Design Requirements Checklist <br />■ Engineering plan review fee (estimated at $500.00) <br />Following the completion of the ACHD Engineering Plan Review process, the contractor(s) <br />who will be completing any work within the county right of way must begin the ACHD Permit <br />process. One permit for work within the County Right of Way ($150.00) and one Street Access <br />permit ($250.00) must be obtained prior to the commencement of any construction. License <br />permit bonding, methods of construction, design details, work zone traffic control, restoration <br />requirements and follow-up inspections are typical elements of the permitting process. Contact <br />Sue Burgmeier via phone at 763.324.3176 or via email at <br />HighwayPermits(aD,anokacountymn.gov for further information and to coordinate the ACHD <br />Permit process. <br />Thank you for the opportunity to comment. Feel free to contact me if you have any questions <br />regarding this review. <br />Sincerely, <br />Logan Keehr, PE <br />Traffic Engineer II <br />xc: CSAH 23/Plats+Developments/2024 <br />Jerry Auge, Assistant County Engineer <br />David Zieglmeier, County Surveyor <br />Sean Thiel, Traffic Engineering Manager <br />Sue Burgmeier, Traffic Technician <br />Brandon Ulvenes, Engineer II <br />
The URL can be used to link to this page
Your browser does not support the video tag.