Laserfiche WebLink
Contractor Lead Certification Verification <br />$ 5.00 /Permit <br />Contractor License <br />$ 50.00 <br />Metropolitan Council SAC (Sewer Availability Charge) <br />Per Met Council <br />Water Meter <br />City Cost plus $50.00 <br />MXU Unit <br />City Cost plus $50.00 <br />Water Meter + MXU Unit <br />City Cost plus $50.00 <br />Touch Pad <br />$ 18.00 <br />Curb Stop Covers <br />$ 70.00 <br />Septic Installation or Repair Permit <br />$ 250.00 <br />Septic Pumping Permit <br />$ 10.00 <br />Demolition Permit <br />$ 73.00 <br />Lawn Sprinkler/Irrigation System Permit <br />$ 73.00 <br />Irrigating or Watering of New Landscaping Permit (Sod <br />$ - No Fee <br />or Seed) <br />Driveway Replacement Permit <br />$ 73.00 <br />Sign Permit: Existing Billboard <br />$ 85.00 /Year <br />Sign Permit: Permanent <br />See Building Fee Table <br />Sign Permit: Sandwich Board <br />$ 35.00 <br />Sign Permit: Temporary (portable/banner) <br />$ 35.00 /Term <br />Storm Pond Aeration Permit <br />$ 150.00 <br />Fee Refund — Per applicant request, City staff may refund permit fees up to 80% for voided permits. Plan <br />review fees and state surcharge fees are non-refundable. No refund shall be provided if permit has expired. <br />All permits issued are subject to applicable State surcharge fees. <br />* Inspections made outside of normal business hours is a three-hour minimum charge. <br />** Or the total hourly cost to the jurisdiction, whichever is greatest. This cost shall include supervision, <br />overhead, equipment, hourly wages, and fringe benefits of the employees involved. <br />*** Actual costs include administrative and overhead costs. <br />An escrow may be required, as determined by the City Engineer, to cover all costs incurred by the City for plan <br />revision and construction observation. <br />ESCROW DEPOSITS <br />In order to obtain a Certificate of Occupancy, escrow deposits shall be collected if exterior work cannot be <br />completed due to inclement weather, as determined by City Staff, whereupon a Temporary Certificate of <br />Occupancy would be issued subject to the execution of an escrow agreement and payment thereof. Any <br />unfinished work must be completed within six months (weather permitting) from the date of issuance. The <br />following escrow amounts are hereby established: <br />a. Driveway - $1,000.00 <br />b. Exterior Concrete - $1,000.00 <br />