Laserfiche WebLink
c. As -built Surveys - $1,000.00 <br />d. Stucco (final coat only) - $1,000.00 <br />e. Garage Floor - $1,000.00 <br />f. Landscaping - $2,500.00 (landscaping may be escrowed year-round per City Staff) <br />g. Other — Determined by City staff at a rate of 125% of the actual improvement costs <br />Escrow deposits will be charged a $100.00 non-refundable administrative fee. <br />Escrow deposits can be submitted through one of the following procedures: <br />a. Escrow can be paid to the City upon execution of an agreement signed by both the payee and the <br />City. <br />b. The title company or lending institution can hold the escrow upon execution of an agreement <br />signed by both the title company or lending institution and the City. <br />A partial release, of a multi -item escrow, will be charged a $75.00 non-refundable administrative fee. <br />RIGHT-OF-WAY MANAGEMENT <br />Excavation Permit Fees <br />Hole (includes administration, plan review, $ 150.00 <br />inspection, testing and mapping) <br />Trench (includes administration, plan review, $ 70.00 /100 Lineal Feet plus Hole Fee <br />inspection, testing & mapping) <br />Obstruction Permit Fee <br />Includes administration, recording, review & $ 50.00 Plus $0.50/ Lineal Foot <br />inspection <br />Permit Extension Fee <br />Includes administration, recording & review $ 55.00 <br />Delay Penalty <br />For up to three days of non -completion and non- $ 60.00 <br />prior notice before specified date. After three days <br />an additional charge of $10.00 per day will be <br />levied. <br />Degradation Fee <br />Degradation Fee Formula: <br />This formula covers degradation for depreciation caused by intrusion into the right-of- <br />way. The depreciation applies to the original surface of the right-of-way and to the <br />overlays and seal -coats applied to the surface. The formula includes life expectancy <br />schedules for each and has an estimated cost per square yard based on the quality of the <br />right-of-way surface required for different levels of traffic. This formula creates a <br />degradation fee which is determined by the cost per square yard for street, overlay, and <br />seal -coat, multiplied by the depreciation schedule, multiplied by the area of the street <br />patch. <br />