My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12/11/2024 PZ Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2024
>
12/11/2024 PZ Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2024 2:42:13 PM
Creation date
12/6/2024 2:35:19 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
12/11/2024
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />12/04//2024 <br />Page 2 <br />Slater Addition Engineering Review <br />2.Currently there is a large low area on the northern half of Lot 3 that receives <br />a large area of drainage from these and adjacent lots but does not drain out <br />•Show the 907.6 HWL limits of this area <br />(Plowe 11/7/24) The 907.6 contour has been added. <br />(WSB 12/4/24) Complete <br />3.Provide high points for where the drainage breaks in the back adjacent to <br />Lot 2. <br />(Plowe 11/7/24) A high point has been added showing the grade break. <br />(WSB 12/4/24) Complete <br />4.Provide drainage and utility easements for surface drainage from one lot to <br />another. <br />Plowe 11/7/24) Additional easement has been granted. <br />(WSB 12/4/24) Complete <br />5.Call out the rear berm. <br />Plowe 11/7/24) Note added as requested <br />(WSB 12/4/24) Complete <br />6.Hold down grades at the front house corners of Lots 1 and 2 as necessary to <br />maintain maximum 3:1 slopes. <br />•Increase frost depths as necessary <br />Plowe 11/7/24) A note has been added indicating the extra depth <br />footings with exposed foundation may be necessary for future <br />building construction. <br />(WSB 12/4/24) Complete <br />7.Provide spot elevations of rear swale from south including all property lines <br />•Show proposed slopes <br />Plowe 11/7/24) The slope of the swale has been added to the plan <br />(1.2%). <br />(WSB 12/4/24) Complete <br />•Try to increase rear swale by adjusting proposed 908 contour line <br />(Plowe 11/7/24) Per 7(b) above, the swale has been adjusted as <br />requested to provide better slope. <br />(WSB 12/4/24) Complete <br />•Stormwater Management <br />Stormwater management is not required under City ordinance.
The URL can be used to link to this page
Your browser does not support the video tag.