Laserfiche WebLink
Ms. Katie Larsen <br />12/04//2024 <br />Page 4 <br />Slater Addition Engineering Review <br />(WSB 12/4/24) Complete <br />i.Show sanitary sewer alignment <br />(Plowe 11/7/24) Similar to the existing water service, it is unclear <br />where the existing services are located. <br />(WSB 12/4/24) Complete <br />ii.Clarify how the existing sanitary sewer manhole to be removed is <br />incorporated into the current system <br />(Plowe 11/7/24) - A note has been added indicating that if the <br />existing septic system is in place, it must be removed per local and <br />state requirements. <br />(WSB 12/4/24) Complete <br />•Show septic system for existing house (Lot 3) if present <br />i.Remove existing septic system per Anoka County requirements with <br />construction and show connecting to the provided sanitary sewer <br />stubs with construction <br />(Plowe 11/7/24) Per above, this house is already connected to city <br />sewer and the septic system has been removed. <br />(WSB 12/4/24) Complete <br />1.Sanitary sewer service stub is 1 1/4" PVC SCH 40 <br />(Plowe 11/7/24) Applicant noted <br />(WSB 12/4/24) Complete <br />2.Show installation of E-One or equivalent grinder pump <br />station <br />(Plowe 11/7/24) N/A <br />(WSB 12/4/24) Complete <br />3.Keep utility services for Lot 3 out of the low area HWL <br />(Plowe 11/7/24) Per 1(a)above, it is unclear where the <br />existing services are located. <br />(WSB 12/4/24) Complete <br />•Transportation <br />There is minimal impact to traffic or roads as this development simply splits the existing <br />single-family lot into three smaller single family lots which will not generate significantly <br />more traffic. <br />•Trails and sidewalks