Laserfiche WebLink
Ms. Katie Larsen <br />12/4/2024 <br />Page 4 <br />Spargur Estates Engineering Review <br />4 Provide written documentation to the City prior to <br />construction <br />(Plowe 11/15/24) See #3 above <br />(WSB 12/4/24) - Complete <br />•(WSB 11/6/24) The Lowest Opening Elevation (LOE) of Lots 2 and 3 must <br />be at least 910.7 to maintain minimum freeboard with the EOF (908.7) <br />1 The Lowest Floor elevation must be a minimum 909.4 <br />(SELO) <br />(Plowe 11/15/24) See #3 above Low floors are 2-feet above <br /> the two basins’ HWLs; low openings are 1-foot above the <br />EOF (908.7). <br />(WSB 12/4/24) Low openings (currently 909.7) need to be <br /> 2’ above the EOF (908.7) <br />•Stormwater Management <br />Stormwater management for the site consists of a small read yard depression. However, <br />based on site layout, stormwater management is not required under City ordinance. <br />Comments on the proposed stormwater design are offered below. <br />Pre- and Post- Development Discharge Rates (cfs) <br />Condition 2-Year 10-Year 100-Year 10-Day Snowmelt <br />Existing 0.66 1.80 4.92 Not required <br />Proposed 0.59 1.85 4.81 Not required <br />Comments: <br />1.There are minor increases in site runoff rates due to the new impervious. <br />However, as stormwater management requirements are not triggered, these <br />increases are not regulated. Runoff to the north and south will be captured <br />by storm sewer routing to City ponds. <br />(Plowe 10/15//24) Noted. <br />(WSB 11/6/24) Complete <br />2.Sufficient freeboard is available between the depression modeled HWL and <br />the proposed household low floors/low entries. <br />(Plowe 10/15//24) Per client request, the units shown are now split-entry <br />walkouts; these low floors had to be raised to meet the 2-ft freeboard <br />requirement. <br />(WSB 11/6/24) The revised lowest openings for Lots 2 and 3 no longer meet <br />minimum freeboard requirements with the adjacent EOFs (909.5+). <br />It is necessary to maintain <br />(Plowe 11/15/24) Lowest openings have been raised to be 1-ft above <br />the ultimate EOF of 908.7. <br />(WSB 12/4/24) Low openings (909.7) need to be 2’ above the EOF (908.7)