Laserfiche WebLink
13 <br />2. Within the public park, the land north of the trail and near the NSP easement will <br />be dedicated to the City but park dedication will not be credited. <br />3. The trail near the townhomes 22R-25R and 21R-18R shall be moved over the <br />stormwater pipe easement. <br />4. A trail shall be constructed along CSAH 54 (20th Ave N.). <br />5. Additional trails south of the wetland shall be considered. <br />6. Trail corridors should be a minimum 30-40 feet in width above the high water <br />level. <br />a. Block 11 shall be re-evaluated. <br /> <br />Tree Preservation and Landscaping <br /> <br />A Tree Preservation Plan and Landscape Plan in compliance with Section 1007.043(17), <br />Required Screening, Landscaping and Buffer Yards shall be submitted. Additional <br />landscaping may be required as a condition of the PUD. <br /> <br />Staff Comments: <br /> <br />1. A landscaping screen and minimum 20ft wide buffer will be required along the <br />CSAH 54 (20th Ave N). <br />2. A noise study will be required with the PUD Preliminary Plan/Preliminary Plat. <br />3. Berm and/or any noise mitigation requirements shall be measured from side or <br />rear yard ground elevations to top of berm or fence. <br />4. Additional landscaping and buffer are required along the north lot line between <br />the trail and townhome private drive. <br /> <br />EQB Environmental Review <br /> <br />The development is in the I-35E Corridor Alternative Urban Areawide Review (AUAR) <br />which was completed in 2005 and subsequently updated. All development within the <br />study area must comply with the AUAR mitigation plan. <br /> <br />Staff Comment: <br /> <br />1. The applicant shall show compliance with the AUAR mitigation plan. <br /> <br />Wetlands <br /> <br />There are nineteen (19) wetlands indicated on the proposed project site. A majority of <br />the wetlands (13) are shown within the currently farmed area of the parcel. These <br />wetlands are considered degraded and have a lower biological value. Any wetlands that <br />are impacted will need to meet mitigation requirements. Larger wetlands on the south <br />side are within the RCWD wetland management corridor and will require a 50’ buffer. <br />