Laserfiche WebLink
Deliverables (Options) <br />• Summary of data collection and review <br />• Summary of ability to reuse water from the three (3) sources mentioned <br />• Reuse concept development and optimization <br />• Conceptual level equipment needs and pricing for each source, if the source is <br />found to be a viable reuse option <br />Task 3: Evaluate Smart Irrigation Controls for the North Oaks Development <br />ISG and Water in Motion will evaluate the possibility of utilizing smart irrigation <br />controller options to manage the use of captured water on proposed irrigation areas <br />and the equipment options available. The review will include a preliminary feasibility <br />study, specifications, estimated potable groundwater reductions, general water use <br />reduction, analysis of appropriate irrigation zones ,irrigation wiring and valve setup, <br />sprinkler head distribution, scheduling and cost estimates. This will consider the use of <br />flow sensors over soil moisture sensors for tracking water use. <br />Deliverable (Options) <br />• A summary of smart irrigation control options for each water source, if the source <br />is found to be a viable reuse option <br />Task 4: Assess Nutrient + Sediment Reduction Loading to Wilkinson Lake <br />ISG will evaluate the combined impacts of the smart irrigation and the regional storm <br />water BMP. In addition to evaluating the combined BMPs, ISG will identify where the <br />most efficient and effective location would be to reduce the nutrient and sediment <br />loading to Wilkinson Lake, specifically in the Wilkinson to Amelia subwatershed. This <br />assumes that general research information states 90-100% of nutrient reduction is <br />occurring with recycled water. This task does not include P8 water quality modeling to <br />substantiate the nutrient reduction. <br />Deliverable (Location) <br />• Identification of the BMP type and optimal location for reducing nutrient and <br />sediment loading to Wilkinson Lake. This is supported by an assessment of the <br />combined effects of smart irrigation and regional stormwater BMPs. <br />Task 5: Feasibility Report Preparation <br />ISG will prepare a feasibility report with findings from the review and evaluation. We <br />will identify potential local, state, and federal grant and funding resources and provide <br />recommendations on the most suitable funding options. Any required permits will be <br />identified within a permit matrix, along with required meetings. A draft of the feasibility <br />report will be provided for review and comment. Feedback will then be incorporated <br />into the final report. <br />Deliverables <br />• Draft feasibility report for review and comment <br />• Partner meeting to make final refinements <br />• Final feasibility report <br />Architecture + Engineering + Environmental + Planning I ISGlnc.com Page 3 <br />