My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12-09-2024 Council Meeting Agenda Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2024
>
Searchable Packets
>
12-09-2024 Council Meeting Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2024 4:45:36 PM
Creation date
12/11/2024 4:05:14 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
12/09/2024
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
710
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotechnical Evaluation <br />This proposal includes subcontracting with a geotechnical consultant to obtain and <br />evaluate three (3) additional soil borings that will be needed to determine site suitability. <br />ISG will coordinate with the selected consultant to identify appropriate soil boring <br />locations. <br />ISG will review all available data and reports, including the feasibility study that was <br />completed by SEH. Upon review, ISG will assess potential alternatives to reduce loading <br />into Lake Wilkinson to determine opportunities to address TMDL goals. Preliminary <br />costs, permitting requirements, and feasibility for each alternative will be evaluated. It is <br />assumed that the original model will be provided by the watershed. <br />Deliverable (Water Quality) <br />• Summary of preliminary review and evaluation of two (2) alternatives; each <br />alternative will including maintenance schedule and access routes <br />Site plan with BMP opportunities <br />• Prepare P8 Model for the two (2) alternatives to evaluate water quality <br />Engineer's opinion of probable costs <br />0 0 Evaluation of project outcomes that advance progress on TMDL goals <br />• Permit matrix <br />• One (1) meeting with the partners to discuss results <br />Task 2: Evaluate Water Reuse in the North Oaks Development Detention Basins + <br />Stormwater BMPs <br />ISG will review the potential of water reuse from multiple sources in the area. <br />This includes consideration of rainwater captured by the proposed stormwater <br />BMP in Task I from runoff to the north of Wilkinson Lake and the proposed <br />stormwater management infrastructure needed for the proposed private <br />development at the southwest corner of Ash Street and Centerville Street. <br />The stormwater BMP option will also include evaluating the quantity of water <br />tributary to the proposed BMP location and the pollutant loads to confirm that <br />the water is suitable as irrigation water for vegetation. <br />The proposed North Oaks Development will be evaluated for volume of water <br />needed for the proposed green space, the necessary detention volume needed, and if <br />a stormwater detention basin can be sized appropriately to draw captured stormwater, <br />the necessary equipment to pump water from the basin to the irrigation system, and <br />potential costs associated with the equipment. <br />Water in Motion will partner with ISG to identify the necessary water quantities on an <br />average annual basis and help select the appropriate equipment and associated pricing <br />at a conceptual pricing level. <br />Architecture + Engineering + Environmental + Planning I ISGlnc.com Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.