Laserfiche WebLink
24-30671 ASH STREET TRAFFIC IMPACT STUDY - LINO LAKES, MN <br />Holly Drive N is a north -south roadway with a posted speed limit of 45 MPH. The typical roadway section is an asphalt two-lane <br />undivided roadway with no shoulders, sidewalk or bicycle accommodations. <br />TRAFFIC CONTROL <br />The intersection of CSAH J/Ash Street and CSAH 21/Centerville Rd is all -way -stop controlled. CSAH 32/Ash Street is stop - <br />controlled at its intersection with CSAH 21/Centerville Road, and a northbound left -turn bypass is provided. Monarch Way, Rapp <br />Farm Blvd, and Holly Drive N are stop controlled at their intersections with CSAH 32/Ash Street. There are plans to reconstruct <br />the CSAH 21/Centerville Rd's intersections with CSAH J/Ash Street and CSAH 32/Ash Street from stop -controlled intersections <br />into roundabouts, and this is anticipated to be completed in 2025. The intersection of CSAH J/Ash Street and CSAH 21/Centervi Ile <br />Rd (Intersection 1) will be a single lane roundabout with 10-foot shared use paths providing bicycle and pedestrian <br />accommodations. The intersection of CSAH 32/Ash Street / CSAH 21/Centerville Rd (Intersection 2) will be a single lane <br />roundabout with 8-foot and 10-foot shared use paths providing bicycle and pedestrian accommodations. Exhibits showing the <br />existing and planned traffic control are provided in Appendix E. <br />VEHICLE CLASSIFICATION <br />Trucks are expected to use CSAH J/Ash Street and CSAH 32/Ash Street to access the study area, then use the development <br />driveways to reach the commercial area. Pedestrians and bicyclists, mainly residents in the proposed developments, are <br />anticipated to use any available pedestrian and bicycle accommodations. <br />Existing Traffic Volumes and Analysis Assumptions <br />Traffic count data was collected through video at Intersections 1 through 5 on Thursday July 18th, 2024 from 6:OOAM - 9:OOAM, <br />and from 3:30PM - 6:30PM. The actual High and Low temperatures for the collection day were 55 ° and 81°. All roadways were <br />clear and dry. The morning (AM) peak hour of traffic for the study area occurred from 7:30 AM to 8:30 AM. The evening (PM) peak <br />hour of traffic for the study area occurred from 4:15 PM to 5:15 PM. About 60% higher traffic volumes were observed during the <br />weekday PM peak hour than the AM peak hour within the study boundary. Some cyclists and no pedestrians were recorded during <br />the peak hours of traffic. Summary diagrams of the network's peak hour vehicular traffic counts are provided in Appendix F. <br />Using Synchro version 11.1, multiple delay computation methods are available, including the Percentile Delay Method, the <br />Highway Capacity Manual 61h Edition methodology, Highway Capacity Manual 2010 Edition methodology, and Highway Capacity <br />Manual 2000 Edition methodology. To analyze the traffic conditions within the study area for this report, Synchro version 11.1's <br />Highway Capacity Manual 6th Edition delay method was utilized for all intersections. <br />Intersections 1 - 5 were modeled. The resulting Synchro analysis worksheets were prepared for the existing conditions and are <br />provided in Appendix G. Tables 1 - 5 show the existing level of service (LOS) and delay for Intersections 1 - 5 for both peak hour <br />periods. <br />In the existing condition, the southbound approach of Intersection 1 operate at a level of service F in both the AM and PM peak <br />hours and all other movements operate at level of service D or better during the AM and PM peak hours. <br />0 Architecture + Engineering + Environmental + Planning Page 3 of 57 <br />