My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01/08/2025 PZ Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2025
>
01/08/2025 PZ Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2025 2:42:20 PM
Creation date
1/3/2025 2:40:37 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
01/08/2025
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
178 E 9TH STREET | SUITE 200 | SAINT PAUL, MN | 55101 | 651.286.8450 | WSBENG.COM Memorandum <br />To: Katie Larsen, Lino Lakes City Planner <br />From: Diane Hankee PE, Lino Lakes City Engineer <br />Date: December 20, 2024 <br />Re: 416 Lilac Street – BRF Enterprises <br />Site Plan Review <br />027620-000 <br />WSB reviewed the Civil plans for the BRF Enterprises site in Lino Lakes, MN, received December <br />10, 2024. The site is 1.06 acres and located at 416 Lilac Street east of 4th Avenue. The lot has <br />frontage along Lilac Street (TH 49). Comments were made on the following documents: <br />•416 Lilac St – BRF Enterprises - Civil Plans prepared by Plowe Engineering, dated <br />December 6, 2024, received December 10, 2024. <br />•416 Lilac St – BRF Enterprises - Stormwater Drainage Report prepared by Plowe, dated <br />December 6, 2024, received December 10, 2024. <br />•Soil Borings and Logs prepared by Haugo Geotechnical Services, dated November 27, <br />2024, received December 10, 2024. <br />The following review comments should be responded to in writing by the applicant. <br />Engineering <br />•General <br />The 416 Lilac Street BRF Enerprises site project proposes to create a professional <br />automotive collision/repair shop which includes the associated parking lot, utilities, and <br />landscaping. The site is located on Lot 5 Block 1 of the Lino Industrial Park Addition and will <br />be accessed from Lilac Street (TH 49). <br />•Grading <br />A grading and drainage plan was provided for the site including paved areas, curb, and <br />retaining walls. <br />Comments: <br />1. Remove the impervious area inside the rear drainage and utility easement. <br />2.Recommend including surface water treatment on the south side of the parking area. <br />3.Provide Emergency Overflow (EOF) elevations for all low points in the parking or <br />green space areas. <br />•Stormwater Management <br />Attachment 7: City Engineer letter dated December 20, 2024
The URL can be used to link to this page
Your browser does not support the video tag.