My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01/08/2025 PZ Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2025
>
01/08/2025 PZ Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2025 2:42:20 PM
Creation date
1/3/2025 2:40:37 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
01/08/2025
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />12/20/2024 <br />Page 2 <br />416 Lilac Street – BRF Enterprises - Engineering Review <br /> <br />Stormwater management for the 416 Lilac Street site consists of constructing a new <br />sedimentation basin on the northwest corner of the site. <br /> <br />Pre- and Post- Development Discharge Rates (cfs) <br />Condition 2-Year 10-Year 100-Year 10-Day Snowmelt <br />Existing 3.96 6.14 10.23 Not required <br />Proposed 3.14 5.12 9.56 Not required <br /> <br /> <br />Comments: <br />1. The City requires that the amount of untreated impervious is 15% of the site total. <br />Current plans show over 50% of the site impervious running offsite without treatment. <br />In order to meet parking requirements, the proposed basin will likely need to be <br />relocated. The City recommends shifting and/or relocating BMPs along the side and <br />rear easements. This would also allow to potentially treat additional areas. <br />2. Due to construction compaction, the pervious areas modeled in drainage area A.1 <br />must have curve numbers consistent with HSG C soils. <br />3. Pending the type of BMP, an outlet control structure with a submerged outlet pipe <br />may be needed. <br />4. A vegetation bench below the basin NWL is recommended. <br />5. Native seeding is needed around the proposed BMP and within the last 20’ of the <br />proposed ditch to stabilize soils. <br />6. Rolled erosion blanketing containing natural netting is needed on BMP or pond <br />slopes. <br />7. Please clarify the gravel drive to 190th St N in the Existing Conditions section of the <br />Stormwater Drainage Report. <br /> <br /> <br />• Water Supply <br /> <br />A 6” PVC C900 water service stub is supplied to the site. <br /> <br />Comments: <br />1. Show approximate location where existing utilities enter the building. <br />2. Verify with MDH whether the proximity of an automotive use prohibits continued use <br />of the existing well. <br />a. Provide documentation to the City <br />3. We recommend that the City Deputy Director of Public Safety-Fire Division review the <br />proposed plan for water supply and hydrant coverage. <br /> <br />• Sanitary Sewer <br /> <br />A 6” PVC sanitary sewer service stub is supplied to the site. <br /> <br />Comments: <br />1. Show approximate location where existing utilities enter the building. <br />
The URL can be used to link to this page
Your browser does not support the video tag.