My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01/08/2025 PZ Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2025
>
01/08/2025 PZ Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2025 2:42:20 PM
Creation date
1/3/2025 2:40:37 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
01/08/2025
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />12/20/2024 <br />Page 3 <br />416 Lilac Street – BRF Enterprises - Engineering Review <br /> <br />• Transportation <br /> <br />The 416 Lilac Street site proposes the use of one existing access off of Lilac Street. <br /> <br />Comments: <br />1. We recommend that the City Deputy Director of Public Safety-Fire Division review the <br />proposed plan for emergency access. <br />a. It appears that any proposed fire truck turning movements would overlap <br />numerous parking spaces that may be occupied in the event of an <br />emergency. <br />2. Provide turning movements for expected delivery/semi-truck vehicles within the lot. <br />3. Based on a 3,220 SF Automobile Care Center use, ITE estimates 7 trips in the AM <br />peak hour and 10 trips in the PM peak hour. The site will have minimal impacts to the <br />adjacent roadway network. <br /> <br /> <br />• Wetlands and Mitigation Plan <br /> <br />The site is in an upland location and wetland are not present. <br /> <br /> <br />• Landscaping <br /> <br />Specific landscaping plans were not provided as part of the submittal. The City’s <br />Environmental Coordinator to review landscaping and provide in-depth comments when <br />provided. <br /> <br /> <br />• Floodplain <br /> <br />No floodplain impacts are proposed on site. <br /> <br /> <br />• Drainage and Utility Easements <br /> <br />Drainage and utility easements are required for stormwater systems. This includes the area <br />encompassing the 100-yr HWL of any BMPs. <br /> <br /> <br />• Development Agreement <br /> <br />A Development Agreement will not be required but a Site Performance Agreement will be. <br /> <br /> <br />• Grading Agreement <br /> <br />Grading agreement not required at this time. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.