My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01-06-25 - Council Work Session Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
01-06-25 - Council Work Session Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2025 8:28:46 AM
Creation date
1/6/2025 5:24:55 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
01/06/2025
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />12/04/2024 <br />Page 3 <br />Transportation <br />A general street layout has been proposed with the Concept Plan. The City of Lino Lakes' <br />Comprehensive Plan requires neighborhood street connections. The applicant is showing <br />connections with the right of way to Peltier Lake Drive and Gordan Avenue in the <br />northwest portion of the development. The City's Engineering and Public Safety <br />departments submit that the roadway connection to Peltier Lake Drive to the south shall <br />be constructed to maintain continuity. The roads stubbed to the southern development <br />limits will need to be evaluated for feasibility with future connections. A traffic study will be <br />required and reviewed with the preliminary plat. An intersection evaluation for the <br />intersection of Watermark Way and CSAH 54 should be conducted as required by Anoka <br />County. <br />An emergency access to CSAH 54 is proposed to be installed at the north end of the <br />private road stub. This access will be evaluated by the City's Fire Official for acceptance. <br />Trails and sidewalks <br />Trails are proposed extending from Peltier Lake in the southwest corner to the northeast <br />corner of the development near the multifamily units as well as generally along the <br />existing trunk storm sewer line from CSAH 54 to the center of the development. <br />Sidewalks are shown along one side of all of the public streets on the submitted Concept <br />Plan. The abandoned segment of Peltier Lake Drive along the lake will need to be <br />converted to a City Trail. A City trail will need to be installed along the west side of CSAH <br />54 for the length of the development. Additional trail and sidewalk segments may need <br />to be included throughout the site at the direction of the City Planner. <br />• Wetlands and Environment <br />The project indicates that there are approximately 15.58 acres of wetland. A wetland <br />replacement plan based on the impacts will need to be submitted, reviewed, and approved <br />through RCWD and the City. <br />The site is located in the Wetland Management Corridor (WMC). Wetland buffers meeting <br />minimum and average requirements will be required around all wetland areas following <br />construction. Any disturbed buffer areas should be seeded with a seed mix containing <br />native, non-invasive, species. <br />Review of the DNR's Natural Heritage Information System database indicates the potential <br />presence of several protected species within and near the project area, including protected <br />plant species. The applicant should coordinate with the DNR on the need for additional <br />studies or surveys. <br />The applicant will need to conduct a Cultural Resource Assessment of the development site <br />through SHPO. <br />Peltier Ponds Development - Engineering Review <br />
The URL can be used to link to this page
Your browser does not support the video tag.