Laserfiche WebLink
CONSTRUCTION Contractor/ CM Mobilize & Pre -construction submittals <br />ADMINISTRATION Groundbreaking for Site / Facility <br />Substantial completion <br />TEAM SERVICESAND DELIVERABLES <br />CONCEPTUAL DESIGN & PROGRAMMING <br />• Complete Building Program <br />• Existing site and building analysis <br />• Recommendations for Facility <br />• Space Needs Assessment <br />SCHEMATIC DESIGN <br />• Preferred Site Layout Diagram <br />• Updated Building Program with <br />Space Needs/ Data Worksheets for <br />each space <br />• Design program, schedule, budget <br />• Initial Building Code Analysis <br />• Building Systems Design Concepts <br />• Envelope <br />• HVAC/Plumbing/Electrical <br />• Structural <br />• Design Concept Drawings and 3-D <br />Renderings <br />• Site Design, Utilities, Grading, and <br />Drainage <br />• Building Design: Floor plans, <br />Elevations, Concept Building <br />Section(s) <br />• Design Concept Narrative <br />• Sustainable Design Concepts <br />• Schematic Design Opinion of Cost <br />DESIGN DEVELOPMENT <br />• Udtdd hdl <br />• Design Concept 3-D Renderings <br />• Design Development Drawings <br />• Civil Drawings <br />• Architectural Drawings <br />• Structural Drawings <br />• Mechanical Drawings <br />• Electrical Drawings <br />• Informational Submittals <br />• Proposed Equipment <br />• Sustainable Design <br />• Building Renderings for <br />material selection <br />• Materials Boards <br />• Code and Quality Assurance <br />CONSTRUCTION DOCUMENTS <br />• Preparation of documents as <br />required for agency bidding <br />• Construction Documents of Drawings <br />and Project Manual for construction <br />of the project. <br />• Manage and coordinate the drawings <br />and specifications of consultants <br />• Assist in the development of bidding <br />and procurement schedule <br />• Complete the final Opinion of Cost <br />for the work <br />• Obtain all necessary applications and <br />approvals from regulatory agencies <br />p a e eslgn program, sc e u e, <br />budget Deliverables <br />• Outline Specifications for all Updated Project Design Schedule of <br />proposed material and equipment Design Reviews <br />• Interim Opinion of Cost <br />PROPOSAL FOR PROFESSIONAL SERVICES FOR THE LINO LAKES PUBLIC WORKS FACILITY <br />• Project Manual and Drawings for <br />bidding and construction <br />• Civil Drawings <br />• Architectural Drawings <br />• Code Conformance Drawings <br />• Structural Drawings <br />• Mechanical Drawings <br />• Electrical Drawings <br />• Interior Drawings <br />• Specifications <br />• Final Opinion of Cost <br />• Project Schedule <br />• Final Building Code Analysis <br />including responses and <br />incorporation of plan review <br />comments for regulatory agencies <br />BIDDING PHASE <br />• Assist in ad for bids and distribution <br />• Conduct pre -bid meeting with prime <br />bidders <br />• Prepare Addenda & respond to <br />Contractor questions <br />• Receive and evaluate Bids and <br />Alternates <br />• Review and verify Bidder <br />Qualifications <br />• Prepare Bid Tabulation <br />• Provide Recommendation of the <br />award of contract <br />CONSTRUCTION ADMINISTRATION <br />• Pre -construction meetings <br />• Conformed Drawings and Project <br />Manual <br />May 2026 <br />Fall/Winter 2027 <br />• Progress meeting minutes <br />• Pre -installation meeting minutes <br />• Submittal and shop drawing review <br />• Jobsite Observation Reports <br />• Respond to RFI's and other inquiries <br />• Maintenance Materials Transmittals <br />• Contractor's Close Out Manuals <br />• Project Documentation and Records <br />including ASI's, RFI's, Requests for <br />Proposals, and Construction Change <br />Directives <br />• Issue Change Order requests at the <br />request of the City <br />• Construction Administration <br />Meetings <br />• Construction Progress Meetings <br />• Substantial Completion Punchlist and <br />Meetings <br />• Warranty Inspections <br />• Review Payment Applications <br />• Post Occupancy Review <br />C <br />19OF <br />KES <br />OERTEL ARCHITECTS- 23 <br />