My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02/12/2025 PZ Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2025
>
02/12/2025 PZ Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2025 10:57:14 AM
Creation date
2/7/2025 10:51:56 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
02/12/2025
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 <br />permitted given the minimum lot size and lot widths for conventional subdivisions and <br />other requirements of the Lino Lakes Zoning and Subdivision Chapters. <br /> <br />After review, it appears both the 60 lot Yield Plan (60 ft wide lots) and the 58 lot <br />Concept Plan (65ft wide lots) meet the minimum R-2, Two Family Residential zoning <br />requirements; therefore, PUD rezoning and yield plan are not needed. <br /> <br />Phasing Plan <br /> <br />A phasing plan was not submitted but it is anticipated that the development would be <br />built in one (1) phase. <br /> <br />Traffic Study <br /> <br />A traffic study is required at the time of preliminary plat submittal. <br /> <br />Staff Comments: <br /> <br />1. The applicant shall work with Anoka County Highway Department regarding <br />access and turn lanes on CSAH 54 (20th Avenue). <br /> <br />Parks, Greenways and Trail Plan <br /> <br />Per Figure 10-2: Neighborhood Service Areas of the 2024 Comprehensive Plan, the <br />development is within the neighborhood service area of North Pointe Park. The <br />greenway system extends through the site and a proposed trail connection is required <br />from the existing trail in North Pointe Park to CSAH 54 (20th Avenue) and CSAH 34 (Birch <br />Street). <br /> <br />Staff Comments: <br /> <br />1. Trail corridor options shall be explored per the attached Public Services <br />Director/Park Board memo. <br />2. If a trail is constructed along the wetland, a connection shall be made between <br />Lot 8-9, Block 1 to the street. <br />3. Trail corridors should be a minimum 20 feet in width above the high water level. <br /> <br />Tree Preservation and Landscaping <br /> <br />A Tree Preservation Plan and Landscape Plan in compliance with Section 1007.043(17), <br />Required Screening, Landscaping and Buffer Yards shall be submitted with the <br />preliminary plat application. <br /> <br />Staff Comments:
The URL can be used to link to this page
Your browser does not support the video tag.