My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02-10-25 - Council Meeting Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
02-10-25 - Council Meeting Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2025 4:15:56 PM
Creation date
2/12/2025 4:05:52 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
02/10/2025
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY COUNCIL <br />REGULAR MEETING STAFF REPORT <br />AGENDA ITEM 6F <br />STAFF ORIGINATOR: Diane Hankee PE, City Engineer <br />MEETING DATE: February 10, 2025 <br />TOPIC: 2025 Street Rehabilitation <br />i. Consider Resolution No. 25-19, Accepting bids, Awarding <br />Construction Contract <br />ii. Consider Resolution No. 25-20, Approving Construction <br />Services Contract with WSB LLC <br />VOTE REQUIRED: Simple Majority <br />INTRODUCTION <br />Staff is requesting Council's consideration to accept bids, award a construction contract, and <br />approve a construction services contract for the 2025 Street Rehabilitation Project. <br />BACKGROUND <br />On December 9, 2024, the City Council ordered the project and authorized the advertisement for <br />bid for the 2025 Street Rehabilitation Project. The street project is in conformance with the <br />City's Pavement Management Program and Capital Improvement Planning. The Pavement <br />Management Program evaluates the condition of the roadways and provides recommendations <br />for maintenance for the City's entire network of roadways. The proposed improvements are as <br />follows: <br />Mill and Overlav (approximately 1.25 miles <br />• Coyote Trl and Ct <br />• Fawn Ln (south of Birch), Beaver Trl, and Muskrat Run <br />• E. Shadow Lake Ct, White Birch Ct, and Red Birch Ct <br />Rid Altarnatac <br />1. Linden Ln (0.3 miles) <br />2. Red Hawk Trl (0.1 miles) <br />3. Thin Overlay of Orange St, Eva St, Olive St, and Maple St (0.82 miles) <br />The bid alternate is advancing part of the 2026 Street Rehabilitation project. The project area has <br />been prone to water system breaks thus gate valves and water system repairs are being replaced <br />as part of the project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.