My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04-14-25 - Council Meeting Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
04-14-25 - Council Meeting Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 3:52:33 PM
Creation date
4/9/2025 3:42:26 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
04/14/2025
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />04/02/2025 <br />Page 6 <br />Water Supply <br />Existing and proposed water services are provided for the 3 commercial lots through <br />existing and proposed City infrastructure on Lake Drive (CSAH 23) and the future Market <br />Place Drive. <br />Comments: <br />1. Coordinate with the City 2025 Market Place Drive Realignment Project for providing <br />the appropriately sized stubs at the appropriate locations <br />(DTE 3/11/2025) The latest design file provided by the City has been included in the <br />plans. <br />(WSB 4/2/2025) See comments and as -bid plans <br />3. We recommend that the City Deputy Director of Public Safety -Fire Division review the <br />proposed plan for water supply and hydrant coverage. <br />(DTE 3/11/2025) Noted <br />(WSB 4/2/2025) Current version to be reviewed <br />4. Show removing all watermain up to the gate valve and the hydrant assembly along <br />the current 77th Street <br />(DTE 3/11/2025) The plans have been revised to include removal of the watermain <br />and hydrant by the City as that is shown in the Marketplace Dr plans. <br />(WSB 4/2/2025) City will remove the hydrant assembly but the watermain shall be <br />removed up to but NOT including the existing gate valve. Plug gate valve for <br />redundancy <br />5. Building A will utilize the existing 6" water service stub instead of installing a new <br />service tee on the main <br />a. Lower water service and insulate below the existing basin <br />(DTE 3/11/2025) The utility plan has been revised per the comment <br />(WSB 4/2/2025) Show existing service <br />rani sire mentc <br />T <br />(OT. E 3/11T2025) Notes -have beeR added�tve the Pan to <br />e�et�=I l,-� ar-r-�s-s the <br />� <br />infermatinn from the nnmment <br />(VVSB 4/2/2025) Complete <br />7. (WSB 4/2/2025) Provide 6" gate valve when connecting to the western water service <br />south of Marketplace Drive <br />a. Provide temporary hydrant or air release bleed pipe on southern end <br />8. (WSB 4/2/2025) <br />Sanitary Sewer <br />Java Properties - Lino Retail 2.0 Engineering Review <br />
The URL can be used to link to this page
Your browser does not support the video tag.