My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04-14-25 - Council Meeting Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
04-14-25 - Council Meeting Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 3:52:33 PM
Creation date
4/9/2025 3:42:26 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
04/14/2025
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />4/9/2025 <br />Page 3 <br />Site disturbances are in an upland location and wetland impacts are not proposed with <br />this addition. Future plats may impact delineated wetlands on site and will need to be <br />mitigated at that time. <br />• Landscaping <br />The City's Environmental Coordinator to review landscaping and provide additional in- <br />depth comments when provided. No landscaping is currently proposed outside the scope <br />of the Aldi project. <br />• Floodplain <br />No floodplain impacts are proposed on site. <br />• Drainage and Utility Easements <br />Drainage and utility easements are required for stormwater systems. This includes the area <br />encompassing the 100-yr HWL of any BMPs. <br />Existing utility (sanitary and water) easements to remain and additional utility easements <br />are to be provided with shared utility mainline extensions (not services). <br />Comments: <br />1. Distinguish new/proposed easements from vacated easements when they are <br />overlapping <br />a. Consider additional document that shows post -vacated plat <br />• Development Agreement <br />A Development Agreement will be required with the final plat. <br />• Grading Agreement <br />Grading agreement not required at this time. <br />• Stormwater Maintenance Agreement <br />The stormwater facilities will be privately maintained and a Declaration for Maintenance of <br />Stormwater Facilities will be required. Both the Rice Creek Watershed District (RCWD) and <br />the City of Lino Lakes shall be parties to the Declaration. <br />• Permits Required <br />1. NPDES General Construction Permit <br />Otter Lake South — Engineering Review <br />
The URL can be used to link to this page
Your browser does not support the video tag.