My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04-28-25 - Council Meeting Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
04-28-25 - Council Meeting Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 2:43:52 PM
Creation date
4/29/2025 2:38:50 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
04/28/2025
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
time of hook-up, whichever is first. The Water Trunk Charge is $2,588.00 per <br />unit. Commercial/Industrial/Institutional (CII) trunk charges are based on a <br />factor of 2.92 units per acre. <br />Availability Charge <br />Commercial/Industrial/Institutional availability charges shall be paid at the <br />time of building permit. Fees are based on the number of sanitary access <br />charge (SAC) units assigned by Metropolitan Council Environmental <br />Services (MCES). <br />City Water (CWAC) $1,628.00 Per SAC Unit <br />C. Surface Water Manaaement Area Charaes <br />The City established a trunk area charge to uniformly distribute the costs of <br />public trunk surface water infrastructure and water quality improvements. <br />The Surface Water Management Charge shall be based on developable <br />acreage, in the amount specified in table below. <br />Acres <br />Fee <br />/Units <br />1. <br />Sanitary Sewer Trunk Unit Fee ($1,801/unit; 2.92 <br />$0' <br />units/Acre) <br />2. <br />City Sewer Availability Fee ($1,686/SAC Unit) <br />6 <br />$10,116.002 <br />3. <br />Water Trunk Unit Fee ($2,588/unit; 2.92 units/Acre) <br />$0' <br />4. <br />City Water Availability Fee ($1,628/SAC Unit) <br />6 <br />$ 9,768.002 <br />5. <br />City Surface Water Management Fee ($/Acre) <br />$03 <br />Total Estimated Developer Fees <br />$19,884.002 <br />'Assessment paid as part of Otter Lake Road and Utility <br />Improvements (1997) <br />2 Sewer and Water Availability fees will be collected with Building <br />Permit <br />3 To be collected with Otter Crossing 2nd Development Agreement <br />D. Metropolitan Council Environmental Services ("MCES") Sewer Availability <br />Charges ("SAC") are in addition to the fees referenced above and shall be <br />determined by MCES and shall be paid with the Building Permit. <br />V. RECORD DRAWINGS. <br />A. Upon completion of the Off -Site Work, Developer shall submit record <br />drawings, in electronic format, of all public and private infrastructure <br />improvements, including grading, sanitary sewer, water main, storm sewer <br />facilities, and roads, constructed by Developer. The as -built survey must <br />Aldi Site Performance Agreement page 4 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.