Laserfiche WebLink
Staff Comments: <br />1. A temporary turnaround will be required at the north end of Street A. <br />2. Sidewalks shall be included on Street B and Street D. <br />3. The trail corridor between Lot 4 Block 1 and Lot 1 Block 2 and east of Lots <br />1-4 Block 4 shall be widened to 30 feet wide. <br />4. Andall Street connection can be reduced to 24 feet wide. <br />Easements and Outlots <br />The applicant has provided 10 feet wide drainage and utility easements along the right-of-ways <br />and along the rear property lines. 5 feet wide drainage and utility easements are provided <br />along the side property lines to provide a total easement wide of 10 feet through both side yard <br />easements, while where a stormwater utility pipe will be located between two lots, the <br />applicant has provided 10 feet wide drainage and utility easements to accommodate the <br />infrastructure. <br />Drainage and utility easements will be dedicated over Outlots A, B, C and D. Outlots A, B, C and <br />D will be owned and maintained by the development homeowner's association (HOA). As <br />stated above, Outlot E should be converted into Lot 11, Block 7. There is a 100-foot-wide gas <br />line easement that runs from southwest to northeast through Outlots A and C. A city lift station <br />will be located with a portion of Outlot D at the intersection of Street C and Street D. Since the <br />lift station will be owned and maintained by the City, this area should be separated from Outlot <br />D through the creation of a new outlot that would be dedicated to the City. <br />60.076d2oa-2 <br />07 <br />.4 <br />'P New Outlot for <br />City Lin Station sW <br />Ig <br />12 :A126 .q,R'1 AA46.aR�llI <br />.079 qR <br />I <br />11 �� So \ -.2L Bo.O —J L— 82.5— Ito 10 <br />l8.651 p R \ <br />R STREET D <br />1 <br />A conservation easement will be required for all protected open space areas (Outlots a, b, c and <br />d). <br />O] <br />