My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05-05-25 - Council Work Session Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
05-05-25 - Council Work Session Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2025 1:29:35 PM
Creation date
5/5/2025 11:17:00 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
05/05/2025
Council Meeting Type
Work Session Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permit Table <br />Permit <br />Agency <br />Timeline to Approval <br />Federal <br />Section 404 NWP 27 <br />US Army Corps <br />60-90 days <br />Local <br />Rice Creek Watershed <br />District Permit <br />Rice Creek Watershed <br />District <br />40 days <br />Wetland Conservation <br />Act No Loss <br />Rice Creek Watershed <br />District <br />60 days <br />',0 Concept 2 <br />Concept 2 builds on the wetland basins described in Concept 1, but with an <br />emphasis on maximizing water quality benefits. The proposed basins are maximized <br />to fill as much of the available space and provide the largest area for <br />evapotranspiration and infiltration. One-way inlets are again proposed to allow water <br />to flow in from the ditch but prevent backflow once water levels draw back down in <br />it. The ditch channel is not proposed to be shifted in this concept. <br />This concept results in the greatest pollutant removal and increase in floodplain <br />capacity. However, that comes at the cost of losing educational and recreational <br />opportunities with the basins. In addition, maximizing basin volume does not provide <br />much diversity in potential wetland improvements as much of it will consist of wet <br />marsh conditions. <br />Shenandoah Improvements Feasibility Report <br />City of Lino Lakes, MN <br />WSB Project No. 018901-000 <br />Page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.