Laserfiche WebLink
U <br />N� <br />0 <br />T y� <br />OVA P. <br />Proposed Storm Sewr <br />Existing Storm Sewer <br />'` ■ Existing CB <br />t • Existing MH <br />Existing FES <br />_ Wetland Basin <br />Birch St BMP <br />Parcels <br />Contours <br />This concept maximizes water quality volume and maintains the one way inlet and ,1 10 ft <br />evapotranspiration drawdown. 1 2 ft <br />BMP Map - Concept 2 C 17 YA90 F Shenandoah Drainage Study 0 100 C Y1 <br />LO NKES City ot ncn = 10o feet <br />f Lino Lakes Feet V V J b <br />1y � <br />Shenandoah Improvements Feasibility Report <br />City of Lino Lakes, MN <br />WSB Project No. 018901-000 <br />Page 11 <br />