My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05-05-25 - Council Work Session Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
05-05-25 - Council Work Session Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2025 1:29:35 PM
Creation date
5/5/2025 11:17:00 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
05/05/2025
Council Meeting Type
Work Session Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permit Table <br />Permit <br />Agency <br />Timeline to Approval <br />Federal <br />Section 404 NWP 27 <br />US Army Corps <br />60-90 days <br />Local <br />Rice Creek Watershed <br />District Permit <br />Rice Creek Watershed <br />District <br />40 days <br />Wetland Conservation <br />Act No Loss <br />Rice Creek Watershed <br />District <br />60 days <br />R_n Concept 3 <br />Concept 3 involves the most holistic improvements for the project, providing benefits <br />to water quality, floodplain management, site ecology, recreation, and education. <br />There are four proposed basins of varying size and depth, providing a variety of <br />wetland environments and water levels. As with the other concepts, water is <br />proposed to enter the basins via one-way inlets. The larger basins are proposed to <br />be of greater depth, allowing for increased water quality volumes to be treated and <br />further reductions in flood elevations. <br />Another major component of this concept is the realignment of the ditch channel <br />through the park. The proposed channel would be approximately the same length, <br />but follow a more natural and winding route instead of the sharp 90 degree turns, <br />reducing drastic velocity changes and the associated potential erosion. <br />Concept 3 would also allow for the playground area in the park to be more easily <br />accessible to Arrowhead Trail and also potentially afford some parking spaces in the <br />space freed up by the ditch realignment. The concept also has potential space for <br />boardwalks or trails through much of the park, providing recreational and <br />educational opportunities through the large and varying spaces of restored wetlands, <br />and providing a pedestrian connection from Arrowhead Tr. to Birch St. <br />Shenandoah Improvements Feasibility Report <br />City of Lino Lakes, MN <br />WSB Project No. 018901-000 <br />Page 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.